This type of lift technique should be used when handling oversized or unusually large boxes.
Team Lift
These three PPE items are required while working on the dock.
Safety Shoes, Safety Glasses, Vest
These five PPE items are required during rack deployments.
Vest, Safety Shoes, Safety Gloves, Hard Hat, Safety Glasses.
This safety document is completed by Logistics every morning.
THA
This should be done when PPE shows signs of fraying or damage.
Get new PPE
This is the weight limit at which a team lift is required.
25lbs
This equipment must be used outside before unloading a truck.
Dock Lock / Wheel Chocks
When an RMS is inside the COLO, this PPE requirement differs from an RMS outside the COLO.
Ear Protection
This reporting tool is used when a safety issue is observed but remains isolated.
Enablon
This is the proper response to a fire alarm in the data center.
Evacuate to assembly area
These are required when performing a team lift with heavy materials.
Impact Gloves
This PPE is required when operating a pallet jack.
Impact Gloves
This tool is needed when cutting a seal.
Bolt cutter
This is required before performing a high-risk activity.
THA for the task
This footwear accessory is required when snow or ice is present on the ground.
Ice cleats
This daily activity is performed by Logistics each morning to prepare for work.
Flex and Stretch
This is the appropriate response when a truck arrives with visible damage.
Stop Work / Escalate
These preparations are completed the day before a rack deployment.
Walk to COLOs, ensure pathway is clear, set up stanchion
This form is completed after an incident occurs.
Incident Form
This action should be taken when a PG spill is observed.
Alert Button
This is the approved method for removing items from EXSP or top-shelf locations.
Step Ladder / Airplane Ladder
This is the safe method for running banding underneath a pallet.
Banding stick
This equipment is attached to a rack when moving a rack with two people.
Rack Stabilizers
This site tool is used to notify others of an incident.
Alert Button
This document must be completed and signed by both teams before any SIMOPS activity begins.
THA