PSMS Basics
LDL
LSRA/JSA/ LMRA
MWPs
EXXON History
100

A planned interrupter 

What is a Hold Point?

100

The person who must be present during Live Dead Live testing.

Who is a First Line or Slider?

100

The number of LSRAs we have under PSMS.

What is 12?

100

This is where the LDL procedure can be found

What is MWP-6012

100

An event that occurred on May 11th, 1920.

What is the year Baytown Refinery began operations?

200

Can occur at any time, provide clues that a hazard is present or safeguard is absent.

What is a trigger?

200

This is the lowest voltage level that requires LDL testing.

What is 50 volts

200

This LSRA is for outside the plant only.

What is driving?

200

This can be found in MWP 6013-Table 1

Where to find PPE requirements for voltage testing?

200

This happened in 1999, creating the company we know today.

What is the year Exxon and Mobil merged?

300

Conducted at the work location, as close as possible to the start of work that has LAI potential

What is a PTB?

300

A device used to confirm the meter is functioning properly.

What is a proving unit?

300

To supplement the LSRA SWC discussion when there are task specific details or hazards not addressed through the LSRA SWC discussion.

When should a JSA be used?

300

This person is in charge of the I&E MWPs.

Who is the I&E craft owner?

300

This was the original company who owned the refinery.

Who is Humble Oil and Refining Co

400

To eliminate fatalities and life altering injuries.

What is the purpose of PSMS?

400

The method circuits must be proven de-energized under 15kV.

What is contact testing?

400

There are nine of these located on the back of the JSA.

What are additional hazards?

400

This MWP covers the timeline for racking certification

What is MWP-6010?

400

The size of the complex in acres.

What is 3,400 acres?

500

Stop, Think, Act

What are the three steps to LMRA?

500

This hand PPE is required when testing for dead at voltage levels above 1,000 volts.

What are arc flash gloves?

500

I have checked there is zero energy and tested for residual or stored energy.

What is the 3rd SWC of Energy Isolation?

500

This MWP has the STA and Live work forms attached.

What is MWP-6011?

500

This is the year Standard Oil changed their name to Exxon.

What is 1972?