Documentation
Psychological Safety Video
Freezing the scene
Noise
Controls
100

This document is completed by a worker before tasks begin.

What is a slam card

100

Hiding issues happens when people fear this.

What is judgment, blame, or repercussions

100

This action is taken before contacting your supervisor, when an incident occurs.

What is freeze the scene.

100

Ringing/buzzing in your ear. And the gradual muffling of sounds is a symptom of this

What is tinnitus

100

This least effective but often necessary control involves items like hard hats, gloves, etc.

What is personal protective equipment

200

This assessment is completed daily with a group of people before work

what is an FLHA

200

Team members do this more often in psychologically safe environments.

What is speak up, raise concerns, and report problems

200

After freezing the scene, what can you do to capture evidence of an incident.

What is taking photos.

200

This protective measure is mandatory if two people cannot hear each other clearly at a short distance

What is hearing protection.

200

This bright clothing makes workers more visible to equipment operators and vehicle drivers.

What is high-visibility apparel/clothing.

300

This morning check is done before moving or driving equipment.

What is a pre-trip inspection.

300

Shooting down an idea harshly or punishing someone for admitting an error causes this

What is poor/bad morale

300

this is done before freezing the scene after a spill has occured.

What is contain the spill with a spill kit.

300

Anything at or above this dB level will cause harm to your ears over time

What is 85db

300

Workers at heights often use this full-body device connected to an anchor point to stop a fall

What is a personal fall arrest system

400
When an incident occurs this needs to be completed within 4 hours and sent to parsons

What is a flash report.

400

When someone shares a concern and the team listens without judgment, it encourages or improves this

What is good morale


400

A scene can be unfrozen only when.

What is: Being given clear instructions by parsons/supervisor

400

A phone at max audio reaches this decible level.

What is 95-110db

400

Installing machine guards, ventilation systems, and noise enclosures, falls under this hierarchy of control

What is engineering controls

500

If working in specific areas or doing a dangerous task it is required to complete this with the supervisor before beginning work.

What is a permit.

500

High performing teams have a higher rate of accidents/incidents compared to poor performing ones. Because these teams felt safe enough to do this.

What is report them.

500

Failing to freeze the scene can affect finding this in an investigation.

What is the root-cause

500

Increasing the dB level from 85dB to 88dB shortens the safe exposure time from 8 hours to this amount.

What is 4 hours.

500

Changing work schedules, providing training, and posting warnings, are examples of this level of the hierarchy of control.

What is administrative.

M
e
n
u