IIPP
Ergonomics
Evacuation
Fire Safety
First Aid
100

Name 3 of the 8 elements of the IIPP? 

Responsibility, Compliance, Communication, Hazard Assessment, Accident/Exposure Investigation, Hazard Correction, Training, Record Keeping

100

How often does BSEE require 14C level devices to be tested?

Monthly not to exceed 42 days.

100

What is the Shell Crane Standard

OPS 0055

100

Who is authorized to reset a tripped motor on the facility?

AEP 2 or anyone who has been blessed as an Electrically trained operator by the SAEP.  ETO has one chance to reset then it requires AEP 2 or higher to investigate.

100

How long are we required to keep records for annual valve lubrication.  UFS file 215

24 months

200

Who enforces the IIPP requirements? 

CAL OSHA

200

When cutting a range chart was is the acceptable amount of days between a high and low on the same chart?

30 Days

200

Name 2 criteria to use a synthetic sling?

Documented in JSA, Needs to be put in lift plan, Made of continuous fiber-type construction, Have extra UV protection, Stored out of sunlight, Know the working load, Proper certification, Know the different configuration loads

200

Who on the facility is authorized to start 480 V+ motors associated with pumps and compressors etc?

Anyone deemed as an electrically trained operator (ETO) by the SAEP.  Training required annually.

200

Safe Work Plans - How long are we required to keep these on site. UFS file 313 

30 days on sight, then shipped to SRTCC for scanning.  Off sight has to maintain records for 24 months.

300

You must regularly do this to your IIPP in order for it to be effective?

An IIPP should be reviewed and updated frequently

300

How often does BSEE require 14C pressure devices using a transmitter to be tested?

Quarterly

300

What should be done with the crane prior to starting operations?

Pre-Use inspection, JSA and permits signed.

300

Before energizing any electrical temporary equipment what must be put in place?

Proper grounding to prevent injury to personnel and to prevent any sparks from generating in a classified atmosphere.

300

Hazardous waste logs.  UFS file 410 what is our retention time.

Current year plus 20 years.

400

What is the fall prevention standard.

HSE 0044

400

What does the acronym BSEE stand for?

Bureau of Safety and Environmental Enforcement

400

Who should be giving signals to the crane operator?

DSP only unless emergency all stop then anyone can give the signal.

400

Who is allowed to change a light bulb on a Shell facility?

Only technicians with an electrical rating.

400

UFS 520 Life boat/capsule - certifications.  How long do we keep them.

Latest plus the previous certification

500

Name 2 of the 7 requirements for fall arrest systems?

Fall arrest systems must: · meet ANSI Z359 requirements, · be constructed and used in such a way that the person’s fall is arrested with maximum free fall of 6' (ideally 1'), · provide a maximum limit arresting force of 1,800 lb. with full body harness, · utilize self-locking, double-action snap hooks or triple-action, captive eye (pinned or permanent) carabineers · be rigged to prevent contact with any lower surface or adjacent structures, · be fitted with suspension trauma prevention kit, and · be removed from service 5 years after manufacture date if constructed of a synthetic web material (this Includes harnesses, lanyards, beam straps, SRL lines, etc.).

500

How often is a sub-sea wells SCSSV required to be tested?

semi-annual not to exceed 6 months.

500

What is considered a designated lift area?

Area blessed by the TA's.  On Stones the starboard and port laydown are the main designated lift areas.

500

What is more dangerous Voltage or Current?

Current.  If Current goes across the heart it only takes between 100 to 200 mA and you can feel an electrical shock at 1 mA.  When you hold a 9V battery to your tounge a total of 1 to 2 mA flows between the terminals.  Anything larger than a 9V could be dangerous.

500

UFS 534 Crane maintenance records.  How long do we keep them?

Active = 48 months on sight.

Storage = 5 years (send to iron mountain)