Analysis
Design
Development
Implementation
Evaluation
100

To measure the health of the program with respect to “Training for Performance Improvement”, L&P uses this performance metric

What is Health-of-Training (HoT) metric?

100

Every objective to be must have this so that it can be  evaluated.

What is Pass/Fail criteria?

100

These two products are the primarily produced from the Development Phase.

What are training materials and evaluation materials?

100

Continuing Training for Nuclear Training Programs must include this minimum number of days of training per calendar year for that functional area.

What is four (4)? s. (3.5.1.5)

100

As part of monitoring line performance and SAT effectiveness, a training program owner can use this report which identifies program weaknesses and actions to address these.

What is the Program Health Report (3.6.2)?

200

This procedure states the frequency of Job Analyses revisions and SAT process at Bruce Power.

What is BP-PROC-001071?

200

This software is the repository for Qual. status.

What is TIMS?

200

Personalization of training materials are allowed. These are two of 4 examples of personalization.

What are personal anecdotes, examples, OPEX, or additional training aids.

200

Performance Improvement topics shall require this to determine if it's an appropriate solution.

What is a Training Needs Analysis (TNA)? (s. 3.5.1.5(3))

200

Training effectiveness for Nuclear and Critical Initial Training Programs are conducted once every what number of years?

What is every 3 years? (3.6.1.1)

300

A Task List Review is required every 6 years, as part of the Job Analysis Review (as required by BP-PROC-01071), this is not required every 6 years.

What are DIF ratings on all tasks.

300

According to SAT governance, this role is responsible for communicating changes to qualification structure to the Training Program Owner.

What/who is the Training Manager?

300

When using industry standard training and training materials, in addition to being accurate, ensure that it is what?

What is up-to-date or current?

300
Training Department Manager will approve courses added or removed from the training schedule inside of this temporal (Time) window from scheduled delivery date?
What is 13-weeks? (3.5.2.3)
300

The Kirkpatrick Model has 4 levels to measure training effectiveness. Level 1 is Reaction, Level 2 - Results, these are Levels 3 and 4?

What are Behaviours (Level 3) and Results (Level 4)?

The Kirkpatrick Model (kirkpatrickpartners.com)

 Level 1: Reaction

The degree to which participants find the training favorable, engaging and relevant to their jobs

Level 2: Learning

The degree to which participants acquire the intended knowledge, skills, attitude, confidence and commitment based on their participation in the training

Level 3: Behavior

The degree to which participants apply what they learned during training when they are back on the job

Level 4: Results

The degree to which targeted outcomes occur as a result of the training and the support and accountability package

400

Training Change Requests must be reviewed and prioritized within this number of days.

What is 30 days?

400

This is used to document on-the-job training and evaluation with a particular task/activity having medium risk to nuclear safety or business.

What is Job Performance Measure (JPM)?

400

When developing new training, lesson plans must include the introduction, the presentation and what? 

What is a summary? (s. 3.4.3.1)

400

Equivalency credits may be granted by the Training Manager for the following cases:

1) initial credit for a new PEL to allow for first delivery

2) initial credit for revised PEL with new objectives added

3) where knowledge/skill/experience is assessed by the Training Manager for CRS/EXAM/JPM/FCO type PELs

What is the other scenario?

What is where no qualified instructor remains or is available for the existing PEL? (3.5.3.2 (c))

400

The Kirkpatrick Model was developed 50 years ago by Jim Kirkpatrick's father, what was his first name?

What is Donald (Don)?

500

The Training Manager files the Job Analysis document according to this records retention archive/file number.

RRA-0398

500

In some cases, higher approvals may be required to make changes to training and qualification structures as outlined in this document.

BP-STND-00032 Learning Governance Oversight Committees Operations

500

This procedure outlines requirements for administering vendor training.

BP-PROC-00210, Training -Administer Vendor Training

500

An exam item analysis is required when training has been provided to at least this number of trainees and either of the following have been met:

1) any single question is >50% failure rate

2) >25% overall exam failure

What is 4 or more trainees? (3.5.7.3)

500

Training Effectiveness Evaluations must be conducted for these types of Programs and using what template?

What are Nuclear and Critical continuing training programs using a TNA template? 3.6.1.1

M