Scaffolding
100

Scaffolds are designed by, constructed and loaded in accordance with that design by this person.

What is a Qualified Person?

200

Suspended, Supported and Aerial Lifts.

What are 3 types of Scaffolding?

300

When an employer has reason to believe that an employee lacks the skill or understanding needed for safe work involving erection, use or dismantling of scaffolding. 

When is Retraining required?

400

The clearance between the lowest rung on an access ladder and the ground.

What is 24 inches?

500

This is the trigger height for Fall Protection on scaffolding.

What is 10 feet?

M
e
n
u