Construction Documents
Material Takeoff
Building Wrap
Wall Surface Prep
Flashing
100

What is the first step of exterior siding installation?  

Familiarizing yourself with the project and having proper tools.

100

Knowing about material take off will help you do what?

Get the right stock and trim materials.

100

What does WRB stand for?

Weather-resistant barrier

100

What is the first step of wall surface preparation?  

Exterior inspection 

100

Where must flashing be installed. 

Around all openings. 

200

What is a soffit?

A non-loadbearing beneath eves that protects the space between roofline and exterior wall.

200

What do you do before beginning and exterior finishing project. 

Check local codes and manufacturers instructions.

200

When is building wrap necessary. 

For a wind and weather resistant seal.

200

What should you inspect when you preform an exterior inspection? 

The sheathing instalation for gaps at the seams, over nailing, and under driven nails. 

200

What is the primary purpose of flashing. 

To prevent water from penetrating the finish material and entering the exterior walls.

300

What are elevation drawings?

Representations of the final project. 

300

Knowing what, will allow you to double check material deliveries 

Knowing the basic princibles 

300

What is building wrap used for?

Protects the exterior sheathing but breathe to allow water vapor to pass from inside the structure to the exterior. 

300

Finding issues early in the preparation phase will give you what?

Time and information you need to address concerns.

300

True or false. 

flashing typically consists of galvanized sheets of metal, aluminum, copper, stainless steel, or a synthetic material.  

True 

400

What plan acts like a birds-eye view describing development phases of final lanscaping?

A site plan. 

400

Who typically preforms the material takeoff? 

The estimator or supervisor. 

400

What do furring strips provide? 

A smooth even backing on which to attach siding boards and panels.

400

What does trapped moisture do to exterior siding?

It can deteriorate sheathing and effect structural integrity, and have the potential to mold. 

400

What is aluminum not used for flashing in what masonry. 

aluminum is more suitible for rust and corrosion. 

500

What is the first step for familiarizing yourself with a new project?

Looking through the construction documents.

500

What are the steps for estimating the amount of siding required for a project? 

1. Determine total area.  

2. Subtract area of all openings.

3. Add waste. (For metal siding add 10 percent.)

500

true of false. 

all horizontal and vertical joints must be sealed with manufacturer approved tape or adhesive. 

True 

500

What should you ensure when you preform an exterior inspection?

The walls are level, plumb and match the dimentions.

500

True or false 

corner flashing should be wide enough to extend 12 in -18 in on each side of the corner. 

False 

It should be 3 in - 4 in.