Totalized 1
Totalized 2
Not Metered
Saver Choice Tech
Other
100

Totalized accounts are characterized by the presence of these

Sub-Meters

100

How often totalized accounts are checked

Monthly

100

Unmetered Rate

E-30 (Extra Small Unmetered)

100

Compatible Meter Type

SRT60

100

Bills default to $0.00 for these

Company Accounts

200

Number of residential totalized accounts

Two

200

The meter that is billed off of

Master Meter

200

For customers with this type of service

Supplied from a single point of delivery

200

Types of qualifying technologies

Primary and Secondary

200

Ad hoc project requiring investigation

Meter Pallet

300

How far off Master Meter usage can be compared to Sub-Meters

The sum of the constants of the sub-meters

300

Contains Master Meter ID, Sum of Constants, Bill Cycle, and More

Senior Totalized Card File

300

Examples of unmetered services

Sprinklers, cable television amplifiers, railroad crossings, bus stops, etc.
300

Not actually required for customers on this rate

Solar

300

Water Pumping Service TOU-compatible meter

M Meter

400

Needs to created for each SP, if this is necessary

Re-Read FA

400

Combines (AMI) Sub-Meter usage

Virtual Totalized Meter

400

Most common error for unmetered services

Contract Quantity not found

400

SRT60 Sequence

1. KWHD

2. KWHD (ON38)

3. KWD (ON38)

4. KWD (OFF38)

5. KWHR

6. KWHR (ON38)

400

Default Residential COW Rate

COW E-12 (Residential - Standard Rate)

500

The KW of the Master Meter should be ___________ the sum of each of the Sub-Meter kW values

Less than or equal to

500

Do this if sub-meter and master meter usage don't match up (describe both scenarios)

Estimate using the sum of the sub-meters if the sub usage is higher. If the master meter usage is higher, don’t estimate and instead bill to the master meter

500

Relevant Contract Quantity Types (2)

Unmetered kWh, unmetered units

500

Saver Choice Tech requirements

Two of more qualifying primary on-site technologies (purchased within 90 days of enrolling in the rate); or

One qualifying primary on-site technology (purchased within 90 days or enrolling in the rate) and two or more qualifying secondary on-site technologies

500

How EPR-2 and EPR-6 apply credits

EPR-2 = Applied to each bill

EPR-6 = Applied yearly

M
e
n
u