General Shop Safety
Arc Welding Safety
Oxy Acetylene Safety
Early Project Planning
Basic First Aid
100

Should always be worn in the shop to protect your eyes

Safety Glasses

100

The primary hazard with arc welding

electric shock

100

Color of the acetylene gas cylinder

maroon or red

100

First step in planning a project

Define the project goals

100

First step to take in case of severe bleeding

Apply pressure to the wound/alert others immediately

200

First action you should take in the event of a fire

Activate the fire alarm/alert the instructor

200

The most important reason for wearing a welding mask

to protect your eyes from UV burns

200

The reason oil isn't used on pure oxygen equipment

Oxygen and oil can cause explosion and fire

200

Why is a timeline important?

To make sure tasks are completed on a schedule

200

First step if something is stuck in your eye

Alert the instructor/visit the eye wash station

300

Why is it important to keep the shop and work areas clean?

To prevent accidents and injuries


300

A trait of the clothing required for welding

fire resistance

300

First step to lighting the acetylene torch

turn the gas on

300

Name a tool used for measuring

Caliper/ruler/micrometer/tape measure

300

One symptom of shock

Pale skin/rapid breathing, vomiting, dizziness, weakness, confusion, anxiety

400

One type of PPE that should be used in the shop

(excluding safety glasses)

Gloves/Boots/welding helmet/earplugs

400

The next step after identifying an issue with the welder

stop use immediately and notify the instructor
400

Next step after the torch goes out while cutting

Close the valves and re-ignite

400

What is a bill of materials?

A list of materials required for a project

400

When should you call for emergency help

if the injury is severe/life threatening

500

What does "lockout/tagout" mean in shop safety?

To disable a machine, disconnect power, and ensure it isn't accidentally activated while being worked on.

500

Distance that flammable materials are kept from the welding area

at least 35 feet

500

Maximum pressure allowed in an acetylene regulator

15 PSI

500

How to determine the cost of materials for a project

Estimate the costs of materials and labor

500

What does CPR stand for?

Cardiopulmonary Resuscitation

M
e
n
u