Operations
Operator Aids
Safety and Signals
Basics limitations characteristics
100

Whip or auxiliary line. 

what is a secondary rope system with a lower capacity than the main rope system?

100

Lowering the boom with the load too close to the boom tip


what is what could two block a crane? 



100

Back that crane up

what is three horn beeps

One Stop

Two move it on out move forward

One long job site horn potential hazard or severe weather, tornado, specific to a site

100

radius increases 

What is capacity decreases?

200

Repetitive lifting, moving of loads that requires crane capacity to be lowered.

what is Duty Cycle Operation?

cement buckets, grabbing clamps claws, wrecking ball, magnetic clamps and lifters all have a potential for side loading and dragging placing strain on the boom and rope 20% reductions of capacity at that radius and boom angle  




200

Were first required on lattice boom cranes built after February 22, 1992


what are Anti-Two-Block warning devices


200

 load does not stay in view of the operator

When is a signal person required? 


200

Freely suspended load

what is load hanging from the hook that is not in contact with the ground or another object?

all load charts are developed off of a freely suspended load, loaded boom angle and boom length. Do not forget 1 degree of level. 

300

crane leverage is greater than the load’s leverage


what is for the crane to complete lifts and operate safely, these leverage conditions must occur?


300

It must be done

it is the law


What does it mean if you see the word “shall” in a regulation?

300
emergency stop all crane movements

what is

300

Lift Director during tandem or multi-crane lift

what is who shall(must) be present at all times while a multiple crane lift is taking place? 


400

the foot of the boom is behind the axis of rotation


What is why can’t most telescopic booms reach a radius equal to boom length?


400

measure the angle of the boom relative to the groun

What is the purpose of a boom angle indicator?

400

Which of the following is not a requirement found in ASME B30.5?

A. Moving parts must be guarded if people can make contact with them

B. Lubrication points should be accessible without removing guards

C. A power line warning must be posted on every crane and visible from the operator’s seat.

D. Floats must be attached to outriggers during use.

E. Operator bodyweight must be considered when determining a crane’s center of gravity

What is D OPERATORS BODY WEIGHT IS NOT CONSIDERED

400

Pine 2x4’s with a one inch gap separating each 2x4

what shall not be allowed or used for blocking under and outrigger float?

1. gap between boards would cause a shift or span blocking

2. pine is not a hardwood approved for lifting or jacking blocking or cribbing  

3. should be thrubolted


500

Outrigger position indicator

what is an operator aid that ensures outriggers are deployed correctly for stability?

Verify visually or post spotter to watch extension of outriggers fully extended then fully lowered and supporting crane tires are off the ground. 90 degrees with pins in pad feet or floats. 

500

anti-two-block warning device alerts 

flashing a light

By sounding an alarm

What is an operator aid that warns the operator of potentially two blocking (warns of the condition)

anti two block limiting device is also an operator aid but it locks out the functions to prevent two blocking. (Locks out Hoist, boom down, extend the boom) all functions which may push block or load farther into the boom point jib point and or boom jib sheave. 

Wire rope damage potential boom or jib damage. 

500

what is extend the boom?

500

Over the front, In line with the travel direction, boom angle and length as low and shortest as possible load as low as possible, without obstructing the operators view, speeds set by the competent person


what is a pick and carry operations?

if the crane is approved for it by the crane manufacturer.

600

first step in setting up a crane on a construction site?


What is Perform site survey.

Verify access roads and clearances to power lines, ground clearance first, verify site soil compaction, no free standing water previous excavation under ground vaults water sewer electric. Coordinate with site supervisor corrections. 

600

Anemometer

What is an operator aid or sensor it’s function is to provide wind speed indications on LMI or gauge in crane operation?

 Common on tower cranes and tall lattice boom cranes.
some cranes have wind speed charts and load surface area calculations.  

600

What is what is boom down raise the load?


600

Not allowed on all cranes, tie the load to the carrier or use tag lines, competent person must be present to supervise the operation

'

what is a pick and carry? 


700
must be done before backing that crane up for example between two buildings or in an alley.  

What is Spotter must be posted?


these are good answers but you must always have a spotter you shall have a spotter

planning the route is first discuss with the signalman/spotter the plan

use your mirrors

Walk the area

700

LMI reading is greater than 75 percent

When is additional verification of load weight required? 

700

Prevent that load from spinning make that boom shorter

What is while holding a tag line retract the boom?

700

'lift weighs more than 90 percent of the cranes maximum line pull

Test the brake by hoisting the load a few inches and applying the brake…..critical lift

@75% verify the weight if the load against the LMI to the bill of lading, weight ticket, weigh station receipt, make sure the load binders and chains were removed from load unbolt from packing pallet or bed.  Critical lift  