Introduction
Before/During/After
Types of Structures
Safety
Site Visit (Check List)
100

What are site visits?

An evaluation process.

100

Which phase (Before/During/After) is collecting site-specific information (Drawings/Reports/Specifications)?

Before

100

What are the (3) types of structures?

Metal/Steel, Wood framing, and Concrete.

100

What does PPE stands for?

Personal Protective Equipment

100

What is the #1 evaluation (must know item) from a building demolition perspective?

The construction type (Structural Evaluation).

200

How can I benefit from a site visit?

Information gains, accurate pricing, better quality responses.

200

Which phase (Before/During/After) is conducting a team debriefing meeting?

After

200

Describe one type of concrete building.

Double T, Single T, Ribs, Waffles, Docks plank, Flat concrete, etc.

200

Name at least (3) components of the personal protective equipment (PPE).

Safety glasses, hearing protection, hard hat, gloves, respirator, safety vest, and steel toe shoes.

200

Can interior walls be anything other than drywall?

Yes.

300

Why are site visits so important?

Presence

300

Which phase (Before/During/After) is to prepare a list of information needs and questions to pursue?

Before

300

Describe one type of wood building.

wood frame, wood joists, wood trusses, etc.

300

What is the most used equipment during a site visit?

Flashlights

300

What are the different layers of architectural finishes?

Ceilings, floorings, walls, and misc. (Tenant debris/casework).

400

What is the best learning experience?

Site Visits (Exposure)

400

Which phase (Before/During/After) is to collect/take photos?

During

400

Describe one type of metal/steel building.

Composite metal deck, composite metal deck w/bar joist, pre-engineered, gypsum bar joist, etc.

400

What does OSHA stands for?

Occupational Safety and Health Administration

400

On Floor/Levels evaluation, what do you must know?

If there are any basements/craw spaces.

500

What are the 8 reasons why site visits are the best learning experience?

Real world, location, means/methods, expertise, safety, decision making, negotiations, and feedback.

500

Which phase (Before/During/After) is to review and compile all the information gathered?

After

500

What is the most economic type of structure to be demolished?

Metal/Steel Buildings

500

Name one type of hazardous.

Excavations/Trenches, Asbestos, Chemical substances, Slips, Noise, Collapsing trenches, electricity, Confined spaces, falling objects, etc..

500
Logistically, when looking at the adjacent structures what are your (6) common options?

Alley, Building, Parking Lot, Trees, Street, and Other.