What is a vision?
An organization’s dream
What does OEE Stand for?
Overall Equipment Effectiveness
The number of known failure patterns as determined by the Nowlan and Heap study?
6
What is ISO 55001?
An international standard that specifies requirements for an asset management system within the context of the organization
The standard unit of measure is expressed in this.
Weeks
This is used to determine the roles and responsibilities based on a business process.
RASI Diagram
What is the formula for OEE?
Availability x Performance rate x Quality Rate
The two categories of equipment failure patterns?
Random and age-related
What is considered best practice for training hours per employee?
80
This is the minimum amount of backlog that should be kept at all times.
2 weeks
What is a mission statement?
An organization’s purpose
What does TPM stand for?
Total Productive Maintenance
FRACAS is an acronym for this.
Failure Reporting and Corrective Action System
What are the 4 stages of team development?
Forming, Storming, Norming, Performing
A collection of job plans is called?
Job Plan Library
What does SMART stand for?
Specific, Measurable, Attainable, Relevant, and Time-Bound
What does DMAIC stand for?
Define, Measure, Analyze, Improve, Control
What is a function?
A quantitative state of what the asset or system is required to perform
How many steps are in Kotter’s Change model?
8
Quantitative tasks are always superior to these.
Subjective tasks
What is a stakeholder?
Anyone in the organization’s internal and external environment that are affected by the organization’s decision and actions.
Name two types of Root Cause Analysis.
Any 2 of the following: 5-Why, Sequence of Events, Event and Causal Factor (ECF) Analysis, Fault Tree Analysis, Logic Tree Analysis, Cause and Effect, FMEA, FMECA
What is a failure Mode?
The effect by which a failure is observed on the failed item
What is culture?
A common set of values, beliefs, attitudes, perceptions, and accepted behaviors shared by individuals within an organization.
What is considered in work order priority?
Asset Criticality & Work Priority