What Test Plan consists of:
IDs Test Items (SIs, units)
ID’s Personnel Resources
ID’s Test Environment
Provides Test Schedules
Traces to Requirements
What is Software Test Plan (STP)
100
Formal Inspection consisting of In-process technical reviews of a product of the software life cycle to find and eliminate defects is considered what type of Software Inspections/Review?
What is Human Based
100
The following can be considered to be apart of what?
Identified tested requirements (SRS)
Traceability of test requirements to SRS & IRS has been established
All software item test procedures have been completed
Test objectives identified
Applicable documentation, procedures and plans are complete and under control
Method of documenting and dispositioning “test anomalies” is acceptable
What is Inputs/Entrance Criteria
200
What Software Plan consists:
Coding & Unit Testing
Unit Integration & Test
SI Qualification Testing
SI/HI Integration & Test
System Qualification Testing
Software Quality Assurance
Corrective Action Process
What is Software Development Plan (SDP)
200
What Type of Software Tests validates that an application conforms to its specifications and correctly performs all its required functions (feature by feature validation)
What is Functional Testing
200
The following items can be considered a part of what?
Lower-level software tests done
Software metrics indicate readiness to start testing
Software problem report system is defined and implemented
Software test baseline established
Development estimates updated
What is Outputs/Exit Criteria
300
What Software Testing Problem Reporting Priority Classification Level is defined as "Adversely affect Mission Accomplishment or cost, schedule, performance or software support + no work-around exists"
What is Priority 2
300
Acceptance, Black Box, Smoke & Regression testing are considered what Type of Software Test?
What is Computer-Based Tests. Also includes:Functuional, Integration, Unit and White Box Testing.
300
What must be demonstrated prior to IOT&E
What is Software Maturity or completeness
400
What Test Plan documents the overall structure and objectives of the T&E program includes critical operational effectiveness and suitability parameters for [among other items]...software and computer resources...it addresses software maturity and the degree to which software design has stabilized..
What is Test & Evaluation Master Plan (TEMP)
400
What type of Software Testing allows for modules to be combined and tested as a group
What is Integration Testing
400
Blank can provide an independent assessment of development, is not always required for Developers with mature processes, low risk system or subsystem and can be costly.
What is Software Independent Verification and Validation (IV&V)
500
The below Items are part of what?
Build the model
Generate expected inputs
Generate expected outputs
Run tests
Compare actual outputs with expected outputs
Decide on further actions
What is Software Testing Best Practice Model-Based Testing or Software Acquisition Gold Practice
500
DAILY DOUBLE !!! What would you like to wage?
What type of test might you do if the below describes your system:
Not limited to age
• Not limited to who built it
– Could be COTS or GOTS
– Could be developed in-house
• Not limited to a specific technology
– Could be mainframe, client/server, web,
etc.
What is Dirty Test
500
What term is used to define,"Ensuring that the software meets the users’ needs.
Answers Question: “Did I build the right system?”