Project Lifecycle
Key EPC Roles
Document Control
Contracts
Insurance
100

What are the 4 main parts of a project lifecycle?

Business Development, Pre-Construction, Construction, Operations & Maintenance  

100

Project specific contracting is primarily completed by these roles?

APM & PM

100

What are the 2 main types of Documents?

  1. Project Documents 

  1. Reference/Template/Training Documents 

100

Contracts set fourth the "Rules of ________"

Engagement

100

This insurance program is designed to protect the Project, Owner, General Contractor and all subs of every tier?

Builders Risk

200

What is the final stage of the project where all documents, warranty, and testing is turned over to the owner and the contract is officially closed?

Closeout

200

What are the four objectives that everyone is responsible for?

  1. Safety 

  1. Client Relations 

  1. Quality 

  1. Adhering to the Project’s contract 

200

When looking at the following Project Number, what year does the project reference: 20446134

2020

200

True/False: You can use an LNTP with subcontractors and suppliers

False; should be used with owners only

200

SOLV enrolling in an Owner-Controlled Insurance Program (OCIP): Is this the typical approach taken with insurance, or is it the exception?

Exception

300

Receiving an RFP is in what part of the project lifecycle?

Business Development

300

True/False: You’ll only work with Departments that are within Business Unit 446?

False

300
True/False: Saving a document to your desktop is a form of document control

False

300

True/False: When working with the same Owner, the terms of each project will be the same on the contract

False – Never assume the terms will be the same even if the owner is the same

300

This reporting method notifies SOLV leadership and other pertinent departments of any possible loss.

Risk Alert

400

This Milestone signifies that all components and systems of the Project have been properly constructed, installed, and functionally tested.  The Project is ready for testing and commissioning.

Mechanical Completion 

400

What are the 4 Operations Business Units that live under the COO, Kevin Deters?

445: Services 

446: EPC 

447: OTS 

549: HV 

400

What is the source of Project Specific Documents?

SharePoint Project File

400

What are the 2 things that are needed for any party to enter a SOLV Project site?

  1. Executed written commitment

  1. Proof of insurance

400

True/False: All contracts with vendors and subcontractors must be fully executed before letting them on site

True