Shipping/receiving PPE
What is Level 1?
gloves, safety glasses, face mask
CI Card labeling
What is the in-chamber location (1-5), date, and process number?
Dargers T90
What is 30 seconds?
Maximum RH reading at the start of the cycle
What is 60%?
Air Wash
What is 20 minutes?
No collection location on COC
What is NA?
Order of filling shelves
What is top to bottom, back to front, left to right?
Portasense T90
what is 2 minutes and 30 seconds?
HP monitoring Anteroom door seal check
What is 15 minutes after gassing starts?
Aeration with Manual Aeration (end of cycle)
What is 2 hours?
All masks from the site are discarded
What is Add box counts --> 0 masks
(do not delete box)
Minimum number of people in the chamber
What is 2?
Additional split box discards
What is added to the first box?
Cycle aborted by user
What is an error 20?
Gassing
What is 1.5 hours?
Print 2 for courier, 1 for FedEx
What is Shipping Doc?
Placed far top right of the chamber
What is CI Card 3?
Maximum HP reading
What is 0.8 ppm?
First action when a new Bioquell receipt is printed
What is confirming the parameters and signing the receipt?
Dwell
What is 2.5 hours?
"Add Process Details"
What is Lot numbers, Expiration dates, Photo of CI cards, and VHP reading?
If Anteroom Loader has to step into the Anteroom
What is deconning before exiting?
Processor, Unloaders, and ________
What is the box exchanger?
%RH readings of Bioquell and HOBO
What is +/- 10%
Total CCDS Cycle (Conditioning to end of Dwell)
What is 4 hours and 10 minutes?