FLOOR TAPE & VISUAL MANAGEMENT
SAFETY & PPE
EMERGENCY PROCEDURES
STACKING & MATERIAL HANDLING
5S IN ACTION
100

Q: This color floor tape marks pedestrian walkways and aisles throughout the facility.

A: What is the green mile?

100

These two items are the required PPE for all associates performing 5S activities in Amazon facilities.

What are composite safety shoes and gloves?

100

Q: This is the number of emergency rally points at our facility.

A: What is 10?

100

This is the maximum number of yellow totes that can be safely stacked at our facility.

What is 11?

100

This 5S principle means removing unnecessary items from your work area, keeping only what you need for your daily tasks.

What is Sort

200

Q:What is caution or physical hazards (such as tripping hazards, low clearance, or areas requiring attention)?

A: Yellow floor tape indicates this type of hazard or area in Amazon facilities.

200

Before beginning any 5S activity involving lifting or moving items, you must follow this safety principle to prevent injury.

What is proper lifting technique (or bend at the knees, keep back straight, lift with your legs, or get help for heavy items)?

200

When you hear the emergency alarm, you should immediately proceed to this location.

What is the nearest designated rally point (or emergency assembly area)?

200

 When stacking yellow totes, you must ensure they are aligned this way to prevent tipping or collapse

What is straight and evenly (or directly on top of each other, corners aligned)

200

During a 5S event, you find tools and supplies scattered across multiple locations. This 5S principle helps you organize them so everything has a designated home.

 What is Set in Order

300

This color floor tape marks the location of fire extinguishers, emergency equipment, and fire exits.

What is red?

300

During a 5S event, you discover a damaged pallet with exposed nails and a spill of unknown liquid. List the three immediate actions you should take.

What are: (1) secure/barricade the area, (2) report to safety team/leadership immediately, and (3) complete a safety observation or incident report (do not attempt to clean up unknown substances)?

300

During a 5S activity, you discover a blocked emergency exit. According to Amazon safety standards, you must do these two things immediately.

What are: (1) clear the obstruction if safe to do so, and (2) report it to your manager or safety team immediately (emergency exits must remain clear at all times)?

300

Before stacking yellow totes to the maximum height of 11, you must first verify these two conditions about the totes and surface.

What are: (1) totes are not damaged or cracked, and (2) the floor/pallet surface is level and stable?

300

Your team completes a 5S event and the area looks great. To ensure it stays that way, you should implement this 5S principle through regular audits and checklists.

What is Sustain

400

Blue floor tape designates these specific areas where materials or products are temporarily stored during processing.

What are work-in-progress (WIP) areas or staging areas?

400

Your team is conducting a deep clean 5S event that involves working at heights, moving heavy equipment, and using cleaning chemicals. Create a comprehensive safety plan including required PPE, permits, and precautions

What is: obtain a work-at-height permit, use fall protection equipment (harness, guardrails), wear composite safety shoes and gloves, add safety glasses and chemical-resistant gloves for cleaning, review SDS sheets for all chemicals, use proper ladder/lift equipment, implement lockout-tagout for equipment being moved, have a spotter for elevated work, ensure adequate ventilation, and conduct a pre-task safety briefing with all team members?

400

This person is responsible for taking headcount at each rally point during an emergency evacuation.

Who is the designated rally point captain?

400

 You observe an associate stacking yellow totes 13 high in a high-traffic area. As a 5S champion, describe your immediate response and follow-up actions.

What is: (1) immediately ask the associate to stop and reduce the stack to 11 or below, (2) explain the safety hazard and maximum stacking standard, (3) verify understanding and provide coaching,

400

You're leading a 5S event in a pack station. Walk through how you would apply all 5S principles, giving one specific example

What is: (Sort) Remove broken tape dispensers and excess supplies, keeping only one shift's worth; (Set in Order) Create labeled zones for boxes, tape, and dunnage with shadow boards; (Shine) Clean workstation and inspect equipment for damage at end of shift; (Standardize) Create visual work instruction showing proper station setup; (Sustain) Implement daily 5-minute station check using audit checklist?

M
e
n
u