Definitions
History
Tools
Waste
5S
100
Total elapsed time from the start to the end the process
What is Cycle Time
100
Between 1948 and 1975, a japanese car company invented a new Lean system known as...
What is Toyota Production Systems, TPS
100
A type of graph used to show data over time
What is a line graph
100
Name the type of waste characterized by excessive movement of parts, equipment or products
What is Transportation
100
What is the First step in 5s?
What is sort
200
Products proceed, one at a time through various operations without interruptions.
What is Single Piece Flow or one piece flow
200
In 1913, this person invented a continuous moving assembly line. What is the name of that person?
Who is Henry Ford
200
Tool that leverages the 80/20 rule
What is Pareto or Pareto Chart
200
Name the type of waste characterized by producing parts that fail or are out of specification.
What is Defects or Rework
200
What is the Second step in 5s?
What is Set in Order
300
Inventory method producing what is needed at just the right time.
What is JIT (Just-In-Time)
300
During WWII, this company built 17 B-17s per day in south Seattle. What is the name of the company?
What is Boeing
300
When teams come together to make rapid improvements in an area typically 3-5 days.
What is Kaizen Event
300
Name the type of waste characterized by staying in a place until an expected event happens.
What is Waiting
300
What is the Third step in 5s?
What is Shine
400
Name all 3 corporate values?
What is Do the right thing, Committed to excellence, Treat People with Respect
400
What was the first American company to win the Deming Award
Who is FPL
400
Project Management technique that leverages sprints to get the activities completed in a short timeframe . Hint IT department relies on this technique
What is Agile
400
Name the type of waste characterized by storing products not needed immediately
What is inventory
400
What is the Fourth step in 5s?
What is Standardize
500
Waste in a process that should be eliminated
What is NVA (Non-Value Added Time), Timtwood
500
Eli Whitney opened a firearms factory in 1798 that was the first to manufacture guns using...
What is interchangeable parts
500
This is a problem solving methodology and collection of tools to analyze and remove sources of process variation.
What is Six Sigma or DMAIC
500
Name the type of waste characterized by under-utilizing employee's skills and abilities
What is Talent
500
What is the Fifth step in 5s?
What is Sustain
M
e
n
u