Working at Heights
Excavation & Trenching
Confined Space
Lifting & Rigging
Work Zone & Traffic
Hazardous Energy
Utilities
Mobile Equipment
Hazardous Chemicals
PPE & Communication
100

The primary energy source behind falls

Gravity

100

All soil on B&S sites is treated as this soil type

Type C

100

The two energies behind confined space hazards

Chemical (atmosphere) and gravity (engulfment)

100

Lines used to control a load’s swing

Tag lines

100

The primary energy in a work zone

Motion (public and site traffic)

100

Each worker puts one of these on the isolation point

Their own lock and tag

100

No mechanized excavation without a valid one of these

One-call (811) ticket

100

Only these people may operate mobile equipment

Authorized operators

100

This document must be accessible at the work area

SDS (Safety Data Sheet)

100

Minimum PPE on every site: hard hat, safety glasses, gloves, safety-toe boots, and this

High-visibility outer layer

200

Rated for 5,000 lb or designed by a Qualified Person

A fall protection anchor

200

Minimum distance spoil piles are kept from the edge

5 feet

200

System where confined space evaluations and alternate procedures permits are recorded

Raken

200

Outriggers must sit on these

Mats or cribbing

200

Flaggers in a work zone must be this

Certified

200

No one works on a system until energy is verified at this level

Zero energy

200

Besides the ticket, these must be verified before digging

Utility marks

200

Must be worn whenever equipment is moving

Seat belt

200

Training the user must complete before using a hazardous chemical

HazCom/GHS

200

Meeting where the Daily Job Brief is discussed

Morning Huddle

300

Guardrail systems and rated, labeled hole covers are this type of control

Direct Controls (Engineering)

300

A ladder or ramp must be within this lateral distance in excavations 4 ft or deeper

25 feet

300

Required retrieval setup for vertical entries

Tripod and winch

300

Use this instead of an excavator when it has no manufacturer lift chart

A crane

300

Minimum ANSI/ISEA 107 high-visibility class on B&S sites

Class 2

300

You must never enter this area around a line under test

The pressure test exclusion zone

300

The two ways a utility in the tolerance zone must be exposed

Hand digging or vacuum excavation

300

What you need before entering the swing radius or travel path

Eye contact with the operator and acknowledgment

300

Flammable liquids are stored and dispensed only in these

Approved, labeled safety containers

300

Every crew member must review and do this to the AHA before work

Sign it

400

Warning lines and a safety monitor together are this type of system

Alternative Control System

400

Depth beyond which a registered PE must design the protective system

20 feet

400

Weather condition that means no entry

Rain or a rain forecast

400

The barricaded area under and around the load is this kind of Alternative control

Physical obstacle

400

Portable concrete barrier or a truck-mounted attenuator

Positive protection (Direct Control)

400

Preferred over pneumatic testing because compressed air stores more energy

Hydrostatic testing

400

Policy that sets overhead line clearance distances

2.31 Utility Avoidance and Underground Utilities

400

ROPS with seat belts is this type of control

Direct Control

400

Who can look up HazCom/GHS training records

All management team members on employees Raken profile under certifications.

400

Besides the site, this document prescribes required PPE

The AHA and SDS

500

Name the three critical controls verified before work at heights starts

Guardrail/cover in place or PFAS anchored with fall clearance verified; rescue plan known to the crew; fall protection equipment inspected

500

The only three acceptable cave-in protections

Sloping (1.5:1), trench box/shield, or shoring

500

The two people who must be in place at the point of entry and outside the space

Entry Supervisor and attendant

500

Name the five critical controls before a lift

Lift plan complete; rigging inspected and rated; exclusion zone barricaded; signal person assigned; ground conditions verified

500

The traffic control plan must follow this federal manual, Part 6

MUTCD

500

The four steps before working on or inside a system

Isolate, lock, tag, verify zero energy

500

Assigned when equipment works near the overhead clearance distance

A spotter

500

Inspection required before equipment is used each day

Daily pre-use inspection

500

Required with hot work when the permit calls for it, besides a fire extinguisher

Hot work permit and fire watch

500

Four changes that stop the work until the plan and AHA are reviewed again

Scope, conditions, equipment, or crew