Acronyms
Construction General Permit
I want to NOT
Maps & Timecard
100

Check the SWPPP

Stormwater Pollution Prevention Plan

100

True / False

Both Primary and Secondary Operators are required to post a CSN on site

True

100

What is the inspector's first step when a client requests termination?

Inform their supervisor

100

When is the ideal time to submit your maps?

Day of inspection once you are home

200

Who is the GC for LD?

General Contractor / Land Development

200

The requirement to initiate stabilization is triggered as soon as it is known with reasonable certainty that..

Construction activity at the site or in certain areas of the site will be stopped for 14 or more additional calendar days

200

Once a project has started, what are the two valid reasons to terminate a customer's permit?

Stabilization or Transfer of Control

200

We need to run post rains one week- you are conducting inspections until 4:45 PM on Monday and 5 PM on Wednesday, but you get home at 1 PM on Thursday.

What time do you clock out on Friday?

2:15 PM

300

According to the CZP, install these BMPs along the LOC

Contributing Zone Permit / Best Management Practices / Limits of Construction

300

If sediment escapes the site, accumulations must be removed at a frequency that minimizes off-site impacts, and prior to the next rain event, if feasible. If the permittee does not own or operate the off-site conveyance, then the permittee shall..

Work with the owner or operator of the property to remove the sediment.

300

What are the requirements for monthly inspections?

Construction activity has ceased on site

Temporary controls / stabilization are installed OR site is fully stabilized

(BONUS- Sites can only transfer to a monthly inspection schedule during the first week of the month)

300

Your first site is 22 miles from your house, and it takes 45 minutes to get there.

Assuming you arrive on site at 8AM, what is your start time in the Timekeeping app?

Bonus- How many miles do you add into the Mileage app?

7:45

Bonus- None

400

TPDES is the regulatory program administered by TCEQ, in accordance with EPA guidelines

Texas Pollutant Discharge Elimination System / Texas Commission on Environmental Quality / Environmental Protection Agency

400

The permittee must revise or update the SWP3, including the site map, within seven (7) days of when any of the following occurs

a change in design, construction, operation, or maintenance that has a significant effect on the discharge of pollutants 

changing site conditions based on updated plans and specifications, new operators, new areas of responsibility, and changes in BMPs 

results of inspections or investigations

400

When an NOT has been approved by your supervisor, what 4 steps need to be taken to fully submit an NOT?

Change BMP responsibility

Request termination of the authorization

Submit final report

Submit final map (depending on transfer)

400

This map is a Final Map for a land development site, submitted for Stabilization.

Find 3 things wrong with this map

bad vibes

500

I passed the CESSWI test! Now I'll study for CPESC

Certified Erosion, Sediment, and Stormwater Inspector / Certified Professional in Erosion and Sediment Control

500

At a minimum, Erosion and Sediment controls must be designed, installed, and maintained to:

(There are 8 requirements for effective controls. Describe 3)

control stormwater volume and velocity within the site to minimize soil erosion 

control stormwater discharges to minimize channel and streambank erosion and scour in the immediate vicinity of discharge point(s)

 minimize the amount of soil exposed during construction activity

minimize the disturbance of steep slopes

minimize sediment discharges from the site 

provide and maintain appropriate natural buffers around surface water in the state 

preserve native topsoil at the site 

minimize soil compaction

500

I want to NOT right now!

-This site is not Stabilized

-There is no operator to assume Control

-Bad Vibes

What do you do?

Inform your Supervisor

500

According to the CGP, there are 10 things a site map must include when they are present on site. 

List 4

property boundary(ies); 

drainage patterns and approximate slopes 

areas where soil disturbance will occur 

locations of all controls and buffers

locations where temporary or permanent stabilization practices are used

locations of construction support activities, including those located off-site

surface waters (including wetlands) either at, adjacent, or in close proximity to the site

locations where stormwater discharges from the site directly to a surface water body or a municipal separate storm sewer system

vehicle wash areas

designated points on the site where vehicles will exit onto paved roads 