CIP Concrete
Precast Concrete
Structural Steel
General
Miscellaneous
100

Identify the overall width and depth of grade beam GB2.

254mm x 1830mm

S2.2

100

Identify the size of concrete block used to construct the elevator walls.

190mm STD block

S2.3, S2.4, S2.5

100

Provide all of the details that describe column C4.

HSS 178 x 178 x 6.4

S2.3

100

What is the design live load for the 3rd Floor?

2.4 kPa uno

S2.4

100

Identify the sheet you will find enlarged plan Stair B 3:04.

A6.2

200

Identify the spacing for the 406mm diameter piles where a double pilecap occurs. 

1218mm or 1220mm

S2.1

200

Identify the type and sizes of driven concrete piles.

P1 = 305mm dia

P2 = 356mm dia

P3 = 406mm dia

S2.1

200

Provide the size of the beam holding up Level 01 along GL B between GL 8 and GL 9.

W610X101

S2.2

200

What is the max aggregate size required for the masonry grout/core infill?

10mm max

S1.1

200

Identify the width of the barrier-free washroom in Men's 2:210.

1520mm

A7.1

300

Identify the types and quantity of CIP concrete piles.

CIP1 (406 dia x 8m) 5

CIP2 (406 dia x 11 m) 4

S2.1

300

How does lintel L1 differ from L2?

L1: 4 courses - 190mm x 790mm

L2: 3 courses - 190mm x 590mm

S2.5

300

Identify the size of the OWSJ specified to support the roof between GL G and GL H.

550mm deep OWSJ

S2.5

300

What is the size and gauge of the typical steel deck?

38mm - 22 gauge

S1.1

300

Identify the longitudinal section number and sheet number.

Building Section A

A4.1

400

What is the thickness of the concrete for the typical sump pit?

150mm

S7.1

400

What is the size of the bond beam and description of the reinforcing used at the third-floor level of the elevator?

190mm bond beam c/w 1-15M continuous

S5.3

400

Identify the type and size of the elevator hoist beam.

W200x21

S2.5, 1/S5.3

400

What is the code standard used to fabricate and erect structural steel in this project?

CSA STD CAN/CSA-S16.1

S1.1

400

Identify the quantity of roof drains in this project.

9

A2.4

500

Identify the typical distance from the centre line of the roof anchor to the edge of the parapet.

2000mm

M