FORECASTING
PROJECT MANAGEMENT
PROCESSES
SERVICES MGT
EFFECTIVENESS
100

In business forecasting, what is usually considered a long-term time period?

Two years or longer (p 52)

100

A project milestone is a specific event to be reached by a particular point in time.

TRUE or FALSE

TRUE

Specific events to be reached at points in time are called project milestones.

100

One trade-off illustrated by the product-process matrix is between flexibility and cost.

TRUE or FALSE

TRUE

To produce nonstandard products at relatively low volumes, workcenters (flexible) should be used. A highly standardized product (low-cost commodity) produced at high volumes should be produced using an assembly line or a continuous process

100

A service system with a high degree of customer contact is less difficult to control than a low degree of customer contact service system.

TRUE or FALSE                      


FALSE                      

Service systems with a high degree of customer contact are more difficult to control than those with a low degree of customer contact.

100

The term "value" refers to the relationship between quality and the price paid by the consumer.

                                       

TRUE or FALSE



TRUE

Related to efficiency and effectiveness is the concept of value, which can be metaphorically defined as quality divided by price.

200

Which of the following forecasting methods is very dependent on selection of the right individuals who will judgmentally be used to actually generate the forecast?

Time series analysis, Simple moving average,
Weighted moving average, Delphi method, Panel consensus

Delphi method

The step-by-step procedure for the Delphi method is: 1. Choose the experts to participate. There should be a variety of knowledgeable people in different areas.

200

A project can be subdivided into which of the following?

Job orders, Sub-jobs, Work packages, Sub-paths, Events and decisions


Work packages

200

When balancing an assembly line, which of the following is not a way to reduce the longest task time below the required workstation cycle time?

Upgrade the equipment, Assign a roaming helper to support the line, Split the task between two workstations, Speed up the assembly line transfer mechanism, Use a more skilled worker

Speed up the assembly line transfer mechanism

200

Which of the following is not a suggestion for managing queues presented in the textbook?

Train your servers to be friendly, Segment the customers, Determine an acceptable waiting time for your customers, Inform your customers of what to expect, Encourage customers to come during slack periods

Determine an acceptable waiting time for your customers

200

It is critical that a sustainable strategy meet the needs of shareholders and employees. It is also highly desirable that it preserves the environment.

TRUE or FALSE



FALSE

A sustainable strategy that meets the needs of shareholders and employees while preserving the environment is critical.

300

Which of the following forecasting methods uses executive judgment as its primary component for forecasting?   

Historical analogy, Time series analysis, Panel consensus, Market research, Linear regression

Panel consensus

300

What is a work breakdown structure?

A list of the activities making up the higher levels of the project - A definition of the hierarchy of project tasks, subtasks, and work packages - A depiction of the activities making up a project - A Gantt chart - A structure that is incompatible with the Critical Path Method

A definition of the hierarchy of project tasks, subtasks, and work packages.


The work breakdown structure defines the hierarchy of project tasks, subtasks, and work packages.        

300

Which of the following is not considered a major work flow structure?

Work Center, Project, Assembly line, Fabrication, Continuous Flow

                 

 Fabrication

The formats by which a facility is arranged are defined by the general pattern of work flow; there are five basic structures (project, workcenter, manufacturing cell, assembly line, and continuous process).

300

Which of the following are the three major components of a queuing system?

The source population, how customers exit the system, and the queuing discipline, The number of servers, the service speed and the waiting line, The source population, how the customer exits the system, and the servicing system, The source population and the way customers arrive at the system, the serving systems, and how customers exit the system, The service speed, the queue discipline and the waiting line

The source population and the way customers arrive at the system, the serving systems, and how customers exit the system.

300

59. One reason for studying operations and supply chain management (OSCM) is which of the following?

OSCM is essential for understanding organizational behavior, Most business graduates do OSCM work regardless of their job title, All managers should understand the basic principles that guide the design of transformation processes, OSCM is a required course in all business degree programs,
OSCM is the most rigorous business discipline


All managers should understand the basic principles that guide the design of transformation processes.


All managers should understand the basic principles that guide the design of transformation processes.

All managers should understand the basic principles that guide the design of transformation processes.

400

Which of the following forecasting methodologies is considered a time series forecasting technique?


Simple moving average, Market research, Leading indicators, Historical analogy, Simulation

Simple moving average

Simple moving average is the only choice that attempts to predict future values of demand based upon past data.

400

43. In a Gantt chart the horizontal axis is usually which of the following?

                                                                          Activities, Cost, Profit, Time, Milestones




Time - See exhibit 5.4a.

400

Which of the following is a basic type of process structure?

Process flow diagram, Product matrix, Process matrix, Workcenter, Manual assembly

Workcenter

The formats by which a facility is arranged are defined by the general pattern of work flow; there are five basic structures (project, workcenter, manufacturing cell, assembly line, and continuous process).

400

The term "queue discipline" involves the art of controlling surly and unruly customers who have become irritated by waiting.

TRUE or FALSE


FALSE

A queue discipline is a priority rule or set of rules for determining the order of service to customers in a waiting line.

400

61. Which of the following are defined as core goods?

Chemicals, Airlines, Data storage systems, Hotels, None of these

Data storage systems

500

Which of the following is not one of the basic forecasting types discussed in the text?

Qualitative, Time series analysis, Causal relationships, Simulation, Force field analysis

Force field analysis

Forecasting can be classified into four basic types: qualitative, time series analysis, causal relationships, and simulation.

500

Which of the following is a graphic project report used in project management?


Project proposal, Approved project plan, Humphrey chart, Equipment and supplies chart, Cost and performance tracking schedule

Cost and performance tracking schedule

500

51. The placement of which of the following is not determined by production process organization decisions?

Departments, Workgroups, Workstations, Machines, Emergency exits



Emergency exits


Emergency exits are determined by safety concerns, not by production process organization decisions.

500

32. A car wash is an example of a single channel, multiphase queuing system.

TRUE or FALSE


TRUE

Single channel, multiphase. A car wash is an illustration because a series of services (vacuuming, wetting, washing, rinsing, drying, window cleaning, and parking) is performed in a fairly uniform sequence.

500

Which of the following is not a measure of operations and supply chain management efficiency used by Wall Street?

Inventory turnover, Revenue per employee,
Receivable turnover, Earnings per share, Asset turnover



Earnings per share