What's the short name of 'Software Considerations in Airborne Systems and Equipment Certification'
DO-178B
What document is CSP-101?
Coding Standards GE9XFADEC
Value is always defined from the perspective of the:
Customer
Which are the three main variables to consider of PM?
scope, time and cost
The AS EEC memory is divided in:
PROM, NVM, RAM
What does DAL mean?
Design Assurance Level
What document is the CSP-037?
Requirement Standards for Common FADEC
This technique can be used to conduct root cause analysis
5 Why, Fishbone diagram, Cause and Effect diagram
Mention one of the tools the team uses for PM
Gantt, risk management template, kickoff, postmortem
Hardware Reset, Software reset, Master Lever Reset, Power-On reset
Mention one of the software development processes
Software design process.
Software coding process.
Integration process.
What does NPSS mean?
Numerical Propulsion System Simulation
What is the typical first step towards identifying the area of waste elimination in a project
Value Stream Mapping
Mention main responsabilities of Project Planning
Detailed instructions on how the project will be carried out, including moment, price and resource estimates
What's the Software level of AS2 (Common FADEC)?
Level C
Mention two phases of our Software life cycle model
Requirements, design, development/implementation, testing
What is the proper order to follow for 'Top-down' testing?
System TV, Closed Loop TV, Open Loop TV, Analysis TV
What is the ongoing process/philosophy of doing things better, faster and lower cost?
Continuous Improvement
Mention main responsabilities of Project Monitoring & Control
Ensuring that a project remains on track and taking corrective action to ensure completion of the project
Mention two packages the SW Functions team own besides NVM, CCDL and WOSP
GSE, MMAMP, PFM, TRIG, Math
Mention three Software Development Lifecycle's
waterfall, V-Model,spiral model, incremental, agile
Mention three components of the FADEC
The purpose of VSM is to:
Identify and eliminate waste
Mention three of the PM phases (6 in total):
Definition, initiation, planning, execution, monitoring&control and Closure
The AS subsystem is divided in conceptual layers, Mention two
Propulsion, Engine, and Subsystem and Component