Port State Control
Pollution Response
Facilities
EPME
WWM
100

If 25% percent or more of the crew has changed a vessel must conduct which two drills within how many hours?

Fire and Abandoned Ship Drill

24 Hours

100

Oil movement trajectory can be estimated what mathematical formula?

3% Wind Drift 

100% Current

Diffusion in the water

100

Drills must be conducted with in how months of each other?

3 Months

100

How large can earrings and beards be?

1/4 in

100

Safety zone general regulations can be found in war subpart?

Subpart C 

200

How many points will a priority 2 vessel receive on the matrix? 

7-16

200

What are the 4 pollution phases? 

Phase 1- Discovery or Notification

Phase 2-Preliminary Assessment and Initiation of action

Phase 3-containment counter measures & Clean up

Phase 4- Documentation Cost and Recovery 

200

Each fire extinguisher on a LHG facility must be in accordance with?  

NFPA 10

200

How many minutes is considered moderate aerobic activity throughout a week?

150min

two and half hours

200

Security zone general regulations can be found where?

Subpart D

300

The vertical line is marked how many inches forward of the center of the plimsol mark? 

21 Inches

540mm

300

What is the most important piece of paperwork related to samples sent to MSL?

Chain of Custody

300

In a DWF containers must be stacked how high?

4 High

300

What is the form number for personal fitness plan?

CG-6049

300

If for a good cause a request for a security zone or safety zone maybe done orally if?

Its at least 5 days before event and within 24 hours a written notice is filed.

400

On sailing vessels what two load lines need to be marked?

Fresh and Winter North Atlantic

400

What temperature must oil samples be stored at inside the refrigerator?

40-42 degrees f

or 

4 to 5 C

400

Break Bulk dangerous cargo must be segregated in accordance with?

49CFR176.83

400

P.E.A.C.E model stands for what?

Planning 

Event Complexity

Assest

Communications

Environment

400

What length of naval is a naval protection zone required?

100 feet

500

For vessels constructed before July 1974 oil containment needed for a vessel 100GT-300GT is?

For vessels 300-1600GT the containment is?

Over 1600GT is?

100-300GT=5 gallon

300-1600=1/2 barrell

Over 1600=1 barrell


500

Oil Shipments must be transported in accordance with?

International Air Transport Association (IATA) DGR Dangerous Goods Regulations

500

Each Marpol reception facility must be able to accept oily ballast water with in? 

10 Hours

500

GAR 2.0 STAAR Model stands for? 

Spread out 

Transfer 

Avoid 

Accept 

Reduce

500

What are the six stages of the permit review process?

Application

Admin Review

Safety review

Environmental review

Issue Permit

Monitor and document

M
e
n
u