If 25% percent or more of the crew has changed a vessel must conduct which two drills within how many hours?
Fire and Abandoned Ship Drill
24 Hours
Oil movement trajectory can be estimated what mathematical formula?
3% Wind Drift
100% Current
Diffusion in the water
Drills must be conducted with in how months of each other?
3 Months
How large can earrings and beards be?
1/4 in
Safety zone general regulations can be found in war subpart?
Subpart C
How many points will a priority 2 vessel receive on the matrix?
7-16
What are the 4 pollution phases?
Phase 1- Discovery or Notification
Phase 2-Preliminary Assessment and Initiation of action
Phase 3-containment counter measures & Clean up
Phase 4- Documentation Cost and Recovery
Each fire extinguisher on a LHG facility must be in accordance with?
NFPA 10
How many minutes is considered moderate aerobic activity throughout a week?
150min
two and half hours
Security zone general regulations can be found where?
Subpart D
The vertical line is marked how many inches forward of the center of the plimsol mark?
21 Inches
540mm
What is the most important piece of paperwork related to samples sent to MSL?
Chain of Custody
In a DWF containers must be stacked how high?
4 High
What is the form number for personal fitness plan?
CG-6049
If for a good cause a request for a security zone or safety zone maybe done orally if?
Its at least 5 days before event and within 24 hours a written notice is filed.
On sailing vessels what two load lines need to be marked?
Fresh and Winter North Atlantic
What temperature must oil samples be stored at inside the refrigerator?
40-42 degrees f
or
4 to 5 C
Break Bulk dangerous cargo must be segregated in accordance with?
49CFR176.83
P.E.A.C.E model stands for what?
Planning
Event Complexity
Assest
Communications
Environment
What length of naval is a naval protection zone required?
100 feet
For vessels constructed before July 1974 oil containment needed for a vessel 100GT-300GT is?
For vessels 300-1600GT the containment is?
Over 1600GT is?
100-300GT=5 gallon
300-1600=1/2 barrell
Over 1600=1 barrell
Oil Shipments must be transported in accordance with?
International Air Transport Association (IATA) DGR Dangerous Goods Regulations
Each Marpol reception facility must be able to accept oily ballast water with in?
10 Hours
GAR 2.0 STAAR Model stands for?
Spread out
Transfer
Avoid
Accept
Reduce
What are the six stages of the permit review process?
Application
Admin Review
Safety review
Environmental review
Issue Permit
Monitor and document