responsible for maintaining central file system by lot and block
What is the Construction Official
Established by an ordinance, Reviewed by the CO, approved by the DCA
What are permit fees?
Levels of licenses
RCS
ICS
HHS
Rearrangement of any
space, by construction of
walls or partitions.
What is an alteration
conducts plan review and calculates fees for his/her area
What is the subcode official
Retention Period for Construction Permits
Life of the Structure
A boiler on a New construction needs these permits
Electrical, Plumbing and fire
occupancy of the building is being used for something other than it was used for initially
Change of use
determines whether something is minor or major work
What is the Technical assistant?
Maximum Penalty one can be issued for work without a permit
$2000.00
form required when doing a Framing inspection
Framing Checklist
Work that requires a permit
and Plan review
Major Work
verifies prior approvals
What is the technical assistant
College or University group
Group B
List all 6 Certificates
1. Certificate of Occupancy
2. Temporary Certificate of Occupancy
3. Lead
4. Certificate of Compliance
5. Continued Certificate of Occupancy
6. Certificate of Approval
state wide comprehensive system for record keeping
Municipal Procedures Manual
Provides prior approval documentation and
plans, as required for job
What is the applicant?
form F100
What is the Construction Permit Application
inspections must be in place before a Framing Inspection
Rough Electric and Rough Plumbing
2 different types of regulations
what are prescriptive regulations and performance based regulations