100

These are the 2 major components of the Contract Documents.

What are the Drawings & the Specs (or the Project Manual)?

100

This is the Title of Div. 00.

What is Procurement & Contracting Requirements?

100

This is the title of Div. 01.

What is Div. 01: General Requirements?

100

This contract (or bid method) is used when there is one price for the entire scope of work.

What is a Lump Sum contract?

100

These typically can amend, add to, or delete from the originally issued Bidding Documents.

What are Addendum?

200

This is usually defined by the Project Manual.

What is the quality of the work?

200

These items are referred to as the Bidding stuff.

What are the Procurement Requirements?

200

These are included in Div. 01.

What are construction contract administration processes, procedures & requirements? 

NOTE: No construction is specified in Div. 01 !

200

Usually based on a constructability review, this is the absolute most the construction will cost for the project.

What is a GMP, or Guaranteed Maximum Price contract?

200

The GMP Contract includes a Shared Savings Agreement for a 50-50 split. The GMP Contract value is $5MM, but was completed at a cost of $4.6MM. What value did the CM/GC receive as their portion of the Shared Contract value.

Shared Savings:

$5MM - $4.6MM = 0.4MM ($400,000)

$400,000 x 50% = $200,000

 (To each the Owner & the CM/GC)

300

This is usually defined by the Drawings.

What is the quantity of the work?

300

These items are related to the Construction Contract.

What are the Contracting Requirements?

300

Div. 01 is divided into these 3 basic categories or groups of requirements.

What are Pre-Construction requirements, Construction requirements & Post-Construction (or Construction Closeout requirements)?

300

This contract type is used when the scope or type of work is known, but the actually quantity of work to be completed is not known.

What is a Unit Price contract?.....like a cost per LF, SF, CF or CY !

(Usually an approximate quantity of work is included with the project scope description)

300

In this Cost Plus a Fee Contract, the following apply:

Materials: $100,000

Labor: $100,000

Equipment: $50,000

The negotiated Fee for OH & P is 30%.

What is the total value of this contract.

Total Costs:

Materials: $100,000

Labor: $100,000

Equipment: $50,000

Sub-total: $250,000

Fee:              X 30%

Total Contract Value:  $325,000

400

These are the 3 main parts of the Project Manual (or Specs).

What are Div. 00, Div. 01, and Divs. 02-49?

400

These are the 4 main items of the Procurement Requirements.

What are as follows:

1. Solicitation

2. Instructions for Bidding

3. Available Information

4. Bid Form

400

Bonus Question

These are the titles of the Sub-Groups for Divisions 02-49.

What are as follows:

Divs. 02-19: Facilities Construction Sub-Group

Divs. 20-29: Facilities Services Sub-Group

Divs. 30-39: Site & Infrastructure Sub-Group

Divs. 40-49: Process Equipment Sub-Group

400

This contract value is calculated via a cost for all Materials, Labor & Equipment, plus a value (or percentage) for OH & Profit.

What is a Cost plus a Fee (or %)?

400

The scope of work is for 6' wide concrete sidewalk, that is 4" thick. It will be placed on an 8" compacted bed of crushed limestone, on 95% compacted earth  bed.

Unit Price is $100/ LF with an approximate quantity of 1,000 LF of sidewalk. 

What is the value of this Unit Price contract.

The Unit Price contract is calculated as follows:

1,000 LF of sidewalk at $100/LF = $100,000

500

These items are included in Divs. 02-49.

What are the construction project products?

500

These are the 4 main items of the Contracting Requirements.

What are as follows:

1. Agreement (or the construction Contract)

2. Construction Bonds (Performance Bond & Payment Bond)

3. General Conditions of the Contract

4. Construction Contract Modifications

500

Bonus Question

These are the titles of the following basic spec Divisions 03, 04, 05, 06, 07, 08 & 09.

What are as follows:

Div. 03: Concrete

Div. 04: Masonry

Div. 05: Metals

Div. 06: Woods, Plastics & Composite

Div. 07: Thermal & Moisture Protection

Div. 08: Openings (or Doors, Windows & louvers)

Div. 09: Finishes (Floor, Walls & Ceiling finishes)

500

This item is used to motivate a CM/GC to be as efficient as possible, when completing construction using a GMP contract.

What is a Shared Savings clause within the GMP construction contract?