What are the Contract Documents, the Bidding Documents or the Construction Documents.
100
A summary, based on the best information available, for quantities & costs of materials, labor, equipment & the Subcontractors costs, including taxes, OH & P.
What is the definition of an Estimate.
100
These 4 items make up the basic Direct costs.
What are the Materials, Labor, Equipment & Subcontractors costs.
100
These include the Title Page, Structural info, Architectural info, Interior Design stuff, and MEP information.
What are the Drawings (or disciplines of the Drawings).
200
GMP
What is the Guaranteed Maximum Price contract.
200
Items which define the Quantity of work, mainly thru the dimensions or sizes & locations of stuff.
What are the Drawings.
200
This professional is knowledgeable about construction products & techniques, reads & understands documents, & is good with numbers......who am I.
Who is the Estimator?
200
General Business Administration support & Project Administration support.
What are the 2 types of Overhead costs.
200
These include the Site Plan, the Floorplan, Elevations, Sections, Details & Schedules.
What are the Drawing types?
300
The cost of Materials, Labor & Equipment plus a percent of a fee.
What is Cost Plus, or T & M (Time & Materials).
300
Items that show the Quality of work, thru the use of product reference standards, & other technical info/items.
What are the Specs.
300
These include the shape & height of the building, the site, the time of construction, and the type of materials used.
What are the factors impacting the project costs?
300
This process includes the Programming phase, then the Conceptual Design/Schematic Design phase, then the Design Development phase, then the Construction Documents or Bidding Documents phase.
What is the Design Process?
300
The Procurement Requirements (of Div. 00) include these 4 items.
What are:
1. The Solicitation
2. The Instructions to Bidders
3. Available Information
4. The Bid Form & Supplements to the BF.
400
This contract is used when the scope of work is known, but the Quantity of work is not known.
What is the Unit Price contract.
400
Title of Division 00.
What is the Procurement & Contracting Requirements.
400
This type of estimate is based on the income producing units of the project, like the number of beds for a hospital, or the number of car spaces in a parking garage.
What is a Rough Order of Magnitude estimate (or a ballpark estimate).
400
This process, early in the Construction phase, includes the following: Setting up the jobsite & field office, securing the jobsite (with fencing), connecting temporary utilities as required for early construction operations, and organizing the jobsite.
What is the Jobsite "Mobilization" process?
400
The Contracting Requirements (of Div. 00) include these 4 items.
What are:
1. Construction Agreement (or the Construction Contract).
2. Construction Bonds (Payment & Performance Bonds)
3. General Conditions of the Contract (for Construction)
4. Contract Modifications (RFI/ASI, CCD's & CO's)
500
Used as motivation for the GMP Contractors & Subs to complete the project as efficiently & effectively as possible.
What is the Shared Savings clause.
500
Title of Division 01.
What are the General Requirements.
500
This type of estimate is based on a completed set of bid documents, including Drawings, Specs & Addendum.
What is a Detailed Estimate?
500
This process includes the following items: Finalizing the Project Record Documents, submitting the O & M Manuals, completing Project Commissioning Requirements, and processing the LEED registration requirements.
What are the Project Closeout Requirements/ or Documents?