Revit is great, but this is the best way to check your work.
What is printing your work and reviewing it away from your desk?
Best advice for new staff
What is “Get out of your seat”
This should be done early in Design Development
When should I start a code plan
Any in-person, video, or phone call where ANY decisions are made, this should be taken.
What are “meeting minutes”.
The period of time a building element, component or assembly maintains the ability to contain a fire, continues to perform a given structural function, or both.
What is fire-resistance rating?
The most common or generic wall section should be located on this side of the page.
What is the right side?
If I want to know more about a construction product.
What is “calling a product rep?”
Construction Type(s) that allow “Wood”.
What is Construction Types III, IV, and V?
Time frame after a meeting that minutes be distributed.
What is 24 hours.
An official, or authority who is responsible for enforcing fire-related regulations or investigating fires.
Who is a fire marshal?
According to Mike, this person should be reviewing drawings prior to the Project Manager.
Who is the Job Captain?
Saying about understanding what you are drawing
What is “Be an Architect, not a Draftsman”
You get extra square footage for this.
What is “open perimeter”?
These two people who review meeting minutes prior to distribution?
The writer and someone else from Design team who was at the meeting.
A fire-resistance rated wall assembly of materials designed to restrict the spread of fire in which continuity is maintained.
What is a fire barrier?
This is the first step before adding Wold Master Details to your drawings.
What is to ask yourself “do these details even apply to my project?”
Favorite Team acronym?
What is “BSND”
A “Fire Barrier” is used for this.
What is needed for “Occupancy Separation”?
This document is brought to meetings to help with meeting minutes.
What is the Attendance Sheet
A road, or passageway developed to allow the passage of fire apparatus.
What is a fire lane?
In door schedules, the suffix pattern for numbering borrowed lights does not start with “A” but instead with this letter.
What is the letter “L”?
Team philosophy related to team staff and projects
What is “one team, get the projects done.
This type requires a one hour resistive rate Corridor.
What is a “Non-sprinkled” building.
This group finalizes and distributes meeting minutes
The Admin Team
A fire-resistance rated wall with sufficient structural stability under fire conditions to allow the collapse of construction on either side without collapse of the wall.
What is a fire wall?