Certificates
Inspections
Definitions
Type of Work
Required Forms
100

Issued for all work that requires a construction permit but not a Certificate of Occupancy

What is a Certificate of Approval?

100

Inspections that need to happen before a Framing inspection

What is Rough Electric and Rough Plumbing?

100

Enforcing Agency

What is the construction/Building Department?

100

Construction work that requires a permit but no plan review

What is Minor Work?

100

F100

What is the Construction Permit Application?

200

Issued at the completion of a lead hazard abatement job.

What is a Lead Abatement Clearance Certificate?

200

The ground upon which the footings of a building are constructed

What is a Foundation inspection?

200

4 Key Players

Who are the Construction Official, Applicant, Technical Assistant, and Subcode Official/Inspector?

200

Work that requires a permit and plan review

What is Major Work?

200

F145

What is a Mechanical Subcode Technical Section?

300

Issued for new buildings/structures, reconstructed buildings, additions and change of use

What is a Certificate of Occupancy?

300

The construction where the weight of the structure is transferred from the base structure to the foundation

What is a Footing inspection?

300

Where a design is used repeatedly

What is a Prototype?

300

The rearrangement of any space

What is Alteration?

300

F110

What is the Building Subcode Technical Section?

400

Certifies to the fact that a general inspection of the visible parts of the building have been made and there are no violations or unsafe conditions.

What is a Certificate of Continued Occupancy?

400

Inspection type for direct replacement of a water heater

What is a final inspection?

400

Zoning, Pinelands, Soil Erosion and Sediment Control

What are prior approvals?

400

The repair, renovation, alteration or reconstruction of any building or structure

What is Rehabilitation?

400

F130

What is the Plumbing Subcode Technical Section?

500
Issued for high pressure boilers, public swimming pools, elevators, pressure vessels, refrigeration systems and cross connections/backflow preventers

What is a Certificate of Compliance?

500

Inspections needed for a HVAC for new construction.

What are rough and final inspections?

500

A license which grants legal permission to start construction of a building project

What is a building permit?

500

When the extent of work will not allow occupancy and will require a new CO

What is Reconstruction?
500

F120

What is the Electrical Subcode Technical Section?