The year Tampa Electric was created
1899
Name one of the three growth pillars
Transition to a clean energy portfolio; Strengthen & modernize grid; Partnering at grid edge
A device used to raise or lower electrical voltage
Transformer
The number to call before you dig
811
EAP
Employee Assistance Program
TECO team member who wrote a poem in 1892 that became a pledge
Francis Bellamy
Competitively prices community solar
Sun Select 2.0
One thousand watts
Kilowatt
This free program is available to residential and commercial customers to help them save money on electricity
Energy Audit
ECC
Energy Control Center
This powered the first TECO power plant
hydro from the Hillsborough River
Enhanced green pricing for one-tiime events
Sun to Go 2.0
The maximum load during a specified time
Peak Load
This free program can help customers enjoy lower rates 87% of the time by making simple changes to energy use
Energy Planner
SPO
Supervisor Plant Operations
He created Tampa Electric
Peter O. Knight
What is our carbon reduction commitment goal for 2040?
80% reduction in CO2 emissions
The process of producing electric energy by transforming other forms of energy
Generation
View up to the minute power outages with this app
TECO Outage Map
STD/ LTD
Short/Long Term Disability
This year TECO shifted from oil to coal
1955
Invest in solar and storage through DC microgrids and developer partnerships
Block Energy
These three recyclable byproducts are produced at Big Bend Power Station
Gypsum, Fly Ash, and Slag
This protects your computer or other sensitive equipment and provides battery back-up to isolated equipment
Zap Cap Uninterruptible Power Supply (UPS)
LOTO
Lock Out / Tag Out