Tecolote's logo includes this animal
What is an owl?
The 2 Most common types of clearances
What is Secret & Top Secret?
What is a Work Breakdown Structure (WBS)?
PPBE
What is Planning, Programming, Budgeting, and Execution?
This is defined as the longest path through the project
What is the Critical Path?
Tecolote was founded in this year as a two-person company
What is 1973?
Where you report Security Incidents, Personal Changes, and Foreign Travel on TecNet
What is Security Self-Reporting?
This cost estimating methodology compares a new system to a similar system where historical cost information is available
What is an analogy?
IMS
What is Integrated Master Schedule?
This is the lowest level of detail within the WBS
What is a Work Package?
This cost estimating software is developed & maintained by Tecolote
What is ACEIT?
The length of time between Contractor Continuous Vetting updates
What is 5 years?
This document ensures that cost projects are based on a common definition of the system and acquisition program
What is a Cost Analysis Requirements Document (CARD)?
LCCE
What is Life Cycle Cost Estimate?
This type of activity must be finished before another activity can start
What is a predecessor activity?
Tecolote's slogan is "Bridging ______ & ______"
What is Engineering & Economics?
Report foreign travel ____ days before your trip
What is 30 days?
This analysis measures the volatility of cost to changes in input parameters?
What is Sensitivity Analysis?
APB
What is Acquisition Program Baseline?
The necessary delay in the start of a successor activity
What is a lag?
Dahlgren Operations started in this year
What is 2007?
These 4 countries require a DCSA Counterintelligence Specialist Briefing before traveling
What is China, Iran, Russia, and North Korea?
This secondary methodology is used to validate the reasonableness of estimate results
What is a crosscheck?
ACWP
What is Actual Cost of Work Performed?
The ratio of earned value to planned value
What is the Schedule Performance index (SPi)?