Define
Measure
Analyze
Improve
Control
100

When do you use Lean?

When Flow, Inventory, and Time are the issues; When there is a lack of standardization; When employees are empowered

100

What is DPMO?

Defects per Million Opportunities

100

Besides VSM, SIPOC, and Process Mapping, name three other analysis tools

Spaghetti Maps, Affinity Diagrams, Takt Time

100

What is PDCA

Plan Do Check Act

100

What is the goal of the Control Phase?

It ensures that the improvements to the process, once implemented, will be sustained, and that the process will not revert to its prior state.

200

What are CTQs?

Key measurable characteristics from the voice of the customer (Critical to Quality)

200

What does Standard Deviation measure?

of variability (dispersion) that is the positive square root of the population/sample variance OR measures the deviation from the mean, which shows the central tendency and the variation from the mean

200

Name the three steps of the Analyze Phase

Establish Current Process Capability, Define Performance Objectives, Identify Variation Sources

200

What is meant by a "Pilot Solution"

Run a real world test, and incrementally correct to find larger solution.

200

What is a simulation?

A means of experimenting with a detailed model of a real life system to determine how the system will respond with changes in its structure

300

When an organization is at Six Sigma, how many errors per million does it have?

3.4

300

Name Four of the Seven Quality Tools

Check Sheet, Cause & Effect Diagram, Flow Chart, Pareto Chart, Histogram, Scatter Plot, Control Chart

300

What are the steps of Analysis Planning?

Generating Xs, Narrowing Xs, Validating the Vital Few Xs

300

What are three tools to improve flow?

5S, Constraint Management, Level Loading / Takt Time, Pull Systems, Lot Size Reduction, Spaghetti Mapping

300

What tool ensures each person uses the same method regularly to meet an objective?

Standardized Processes

400

What are three ways to map?

Value Stream Mapping; SIPOC Analysis; Process Mapping; Spaghetti Mapping; Flow Charting

400

What is Continuous Data and what is Discrete Data

Continuous: Actual times, actual deviations, ratings across a list

Discrete: met specifications or not, on time or not, Yes/No

400

Name three charting methods used in Analyze

Histograms, Time Charts, Run Charts, Pareto Charts, box plots, Simple Regression

400

What is the goal of Error-proofing?

The use of solutions and improvements that either completely prevent or reduce the risk of a failure occurring by eliminating the root cause OR detect a failure soon after it has occurred.

400

Why use a Control Plan?

Provides an institutional memory of the status of a process and the measurements that define it.

500

What are the steps in the Define Stage?

Identify CTQs; Develop Team Charter; Define process map

500

What does SIPOC stand for?

Supplier, Input, Process, Output, Customer

500

Name both Steve's favorite chart type, and his least liked chart type

Pareto Chart, Pie Chart

500

What are methods to Shape a Vision?

Customer Focus Alignment, Backwards Imaging, More of / Less of, Elevator Speech

500

What is SCAMPER?

Substitute, Combine, Adapt, Purpose, Eliminate, Reverse

M
e
n
u