Safety!
Operation
Loading/ Unloading
Terminology
Who's Responsible?
100

You should not operate the rigging system unless you have been properly ________

What is trained?

100

What is the phrase you should say when you are bringing a batten towards the deck?

What is "Line set 'X' coming in!"
100

Counterweights that are painted or clearly marked are considered _______ and should never be removed.

What is permanent 
100

This a term for the pipe that comes in and out

What is a batten

100

This is the person who will be in charge of the loading/ unloading of the rigging system

Who is the lead rigger? 

200

When climbing above the stage (such as to the loading gallery) you should always empty your _______

What is pockets

200

A load that moves without someone pulling the hand line is ________ (balanced/ unbalanced).

What is unbalanced
200

This is the location where counterweights are added to the arbor.

What is the loading gallery/ bridge?

200

This is the term for the part of the rigging system that gets pulled by a rigger to move the batten up and down.

What is the Hand Line?

200

This is the person who is looking out for hazards while the rigging system is moving. 

Who is the spotter

300

The ______ should be clear before anyone loads/ unloads the arbor

What is the deck

300

A _______ (balanced/ unbalanced) load is able to be moved easily.

What is balanced
300

When attaching aircraft cable to scenery- the cable should be attached to the _______ (bottom, top, middle)

What is the bottom
300

This is a term for the portion of the rigging system that holds the counterweights

What is the arbor

300

This is the crew that will be physically loading/ unloading

Who is the bridge crew

400

This type of specialized headset is used for show communication between the rigger and spotter.

What is clear com

400

Rope Locks can be used to hold an unbalanced load for a maximum of ______ minutes

What is 0

400

When loading a piece of scenery/ equipment to a batten- the _______ (arbor/batten) should be added first. 

What is the batten
400

This is the term for the area of a theatre that houses the lift blocks. 

What is the grid

400

During a show performance- this person will determine when exactly the rigging system will move

Who is the stage manager

500
A rope lock is designed to hold a maximum of _____lbs

What is 50lbs

500

If a load is unbalanced you are at risk for a _______

What is a runaway

500

Spreader plates should always be added to the arbor every ______ feet. 

What is 2

500

This is the term for the pulley in a rigging system that lives at the bottom- or next to the locking rail. 

What is the tension block

500

The main person recognized for revolutionizing the rigging industry.

Who is J.R. Clancy 