Panel
Slab
Bracing
Other
100

How should a panel that cannot be set in its final position after being lifted be handled?

Must place it as close to final location and temporarily brace it. Must NOT set it down horizontally.

100

How can you test the effectiveness of a bond breaker after it is in place?

Dropping water on the slab and seeing if it beads up. If it does, the bond breaker is still effective.

100
What is the minimum number of braces required per panel?
2
100

What is a "blind" pick?

When the crane operator loses sight of the rigging after panel has been lifted

200

How many panels can an average two-man crew complete the formwork for (ready for reinforcement) in a day?

8-12 a day

200

Define a closure strip.

A strip of the slab on grade along the exterior that is not poured until the panels have been placed.

200

When should the required lateral bracing and knee bracing be installed?

As soon as the crane and crew are clear, and before the next panel is erected if possible.

200

What is the recommended safety factor for brace anchors?

1.5

300

List acceptable methods for curing tilt-up panels.

1. Spraying the panel surface with a curing compound per the manufacturer's guidelines

2. Wet cure

300

What should be done to free a panel that sticks to the floor slab?

Carefully use wedges and pry bars to help release the panel

300

What is the preferred time to attach braces to the panel when casting inside face up?

Before lifting the panel

300

Who gives the crane operator the signals during the panel lift?

Rigging foreman

400

What is the minimum compressive strength and minimum flexural strength required for panels prior to lifting?

Min. compressive strength: 2500 psi

Min. flexural strength: 400-500 psi

400

How should bond breaker be placed when reinforcement is already in place?

Reinforcement must be removed before bond breaker is sprayed. Rebar CANNOT come into contact with bond breaker.

400

How many inches should a panel be within plumb prior to releasing the rigging?

4 inches

400

What distance does OSHA require as a minimum horizontal separation between power lines and crane rigging?

20 feet

500
What are the two most important items when planning a tilt-up project in regards to the panels?

Panel layout and sequence

500

What is the primary reason water is removed from the panel perimeter and openings prior to lifting?

Standing water prevents air from entering under the panel and creates additional load required to break the bond.

500

How are intersecting braces handled at corners of buildings?

Braces may have to be skewed or have their heights staggered

500

How does the addition of water to fresh (green) concrete affect the concrete's strength?

It lowers the compressive strength (f'c)