Project Lingo
Financial Parlance
Supply Chain Disruptions
100

APT is a cybersecurity threat that establishes a long-term unauthorized presence on a network or computer system.

What is Advanced Persistant Threat?

100

BSS is a packaged software solution used to model liquid flow in a pipeline.

What is Batch Shipment Simulator or Scheduler?

100

WBS

What is a Work Breakdown Structure?

100

AFE

What is Authorization for Expenditure? or What is Average Funds Employed?

100

ARO

What is After Receiving Order or After Receipt of Order?

200

SASE is a cloud-based solution that converges network and security functionalities.

What is Secure Access Service Edge?

200

CMT is used to receive pump orders and tank orders by the Control Center Operations to create a daily schedule line plan and terminal plan.

What is Commodity Movement Tracking?

200

POV/OAV

What is Parallel Operation Validation and Operation Availability Validation?

200

FAC

What is Forecast at Completion?

200

BOL

What is Bill of Lading?

300

ZTNA provides remote access to corporate resources on a case-by-case basis in compliance with strict policy requirements.

What is Zero Trust Network Access?

300

FERC

What is the US Federal Energy Regulatory Commission?

300

ECR

What is an Engineering Change Request?

300

CCA

What is Cost Center Accounting or Capital Cost Allowance?

300

DOA

What is Delegation of Authority?

400

IPS/IDS

What is Intrusion Prevention System and Intrusion Detection System?

400

MBS is a technology used for leak detection on a liquids pipeline.

What is a Mass Balance System?

400

LLDB

What is Lessons Learned Database?

400
AFUDC

What is Allowance for Funds used during Construction?

400

IOM

What is Inventory Optimization Model?

500

UTM is a term for security solutions that provide a number of different network security functions. 

What is Unified Threat Management?

500

ET-CTIS

What is Electronic Ticketing & Custody Transfer Information System?

500

ATP

What is an Acceptance Test Procedure?  What are detailed step-by-step instructions for the set-up, operation, and evaluation of test?

500

ROM

What is Rough Order of Magnitude?

500

MRR

What is Material Receiving Report or Monthly Results Review