What is the 1st step of assembling the tower garden?
Make sure the reservoir base is leveled.
What do you use to secure the rods to the reservoir lid?
What part is connected to the pump?
Swivel Hose
What part(s) secures the rods?
Washers & Wingnuts
What part of the tower garden has to be leveled?
The reservoir base.
What is step 4 of assembling the tower garden?
Stack the tower sections on top of each other.
What part can be stacked together?
What part gives you access to the reservoir base.
Access lid
Making sure the reservoir base is leveled is the ______ step.
First
What step is install the shower cap & lid.
Step 5
What part holds the water?
Reservoir Base
What part needs to be leveled?
Reservoir base
What step is when you assemble the pump swivel hose and reservoir lid.
Step 2
What is step 6 in assembling the tower garden?
Insert plant pods.
What part delivers water evenly?
Shower cap & lid
What part holds the plants pods?
Tower section
What is the 3rd step in assembling the tower garden?
Secure the rods to the reservoir lid, using the washers and wingnuts.
How many steps are their to install the tower garden?
Six
What part controls the pump?
Timer
What part goes over the reservoir base?
The reservoir lid.