Assemble 1
Assemble 2
Parts
More Parts
100

What is the 1st step of assembling the tower garden?

Make sure the reservoir base is leveled.

100

What do you use to secure the rods to the reservoir lid?

Washers & Wingnuts
100

What part is connected to the pump?

Swivel Hose

100

What part(s) secures the rods?

Washers & Wingnuts

200

What part of the tower garden has to be leveled?

The reservoir base.

200

What is step 4 of assembling the tower garden?

Stack the tower sections on top of each other.

200

What part can be stacked together?

Tower Section
200

What part gives you access to the reservoir base.

Access lid

300

Making sure the reservoir base is leveled is the ______ step.

First

300

What step is install the shower cap & lid.

Step 5

300

What part holds the water?

Reservoir Base

300

What part needs to be leveled?

Reservoir base

400

What step is when you assemble the pump swivel hose and reservoir lid.

Step 2

400

What is step 6 in assembling the tower garden?

Insert plant pods.

400

What part delivers water evenly?

Shower cap & lid

400

What part holds the plants pods?

Tower section

500

What is the 3rd step in assembling the tower garden?

Secure the rods to the reservoir lid, using the washers and wingnuts.

500

How many steps are their to install the tower garden?

Six

500

What part controls the pump?

Timer

500

What part goes over the reservoir base?

The reservoir lid.

M
e
n
u