LOTO
Confined Space Entry
Hot Work
Waste
Storm water
Hazard Recognition
SWP
Air Permit
100

Who performs LOTO action described by the ESP

Authorized person

100

When is a confined space a 'permit required confined space'? 

Its contain or has the potential to contain a hazardous atmosphere, has potential for engulfment, a small area that could entrap or asphyxiate an entrant or contains any other recognized safety or health hazard potential

100

Examples of high energy ignition sources

Welding, cutting, grinding

100

What is are the 4 hazardous waste characteristics?

Ignitability, corrosivity, reactivity, toxicity 

100

How often do we have to sample storm water

Quarterly

100

What does HRP stand for?

Hazard Recognition PLUS

100

What does SIF stand for?  Name 4 

Severe incident factor / hot work, confined space entry, working at heights, LOTO/first breaks, ATM, high pressure water cleaning, moving vehicles, excavation, machine guarding

100

What is Morganton's air emission control device?

Thermal oxidizer 

200

what is required if you observe the seal on a lock box does not match the ESP

Restart the LOTO process, verify all locks against the ESP and walk the job with person performing work
200

What is the attendants job?

Stay at the space, monitor the conditions (LEL, O2, CO etc), summon rescue / EMS, perform non-entry rescue

200

What are examples of low energy ignition source

cameras, cell phones, power tools, work in classified area 

200

What does TCLP stand for? 

Toxic characteristic leaching procedure

200

What are we looking for during to discharge tankfarm containments?

visual contamination / sheen / odor

200

What is a hazard

the potential of uncontrolled release of energy that could result in unwanted contact that could cause harm

200

How long can a work area be left unattended?

max of 30 minutes, anything longer it requires to rewalk the job 

200

What is min temp for oxidizer?

1400 F 

300

When can you use single valve to lock out a system?

Non hazardous materials with low temperature / pressure on the other side of the valve

300

Who can enter a confined space?

Entrant

300

Who can issue hot work permits?

Only people who have been through hot work permit training


300

What is Morganton's generator status? 

Small Quantity Generator

300

What is Pat's favorite word (or maybe least favorite word:) )?

Rip Rap

300

What are the sources of energy

Motion, Chemical, Radiation, Electrical, gravity, heat and cold, biological, pressure 
300

when do you need to write a SWP

if there is no operating procedure / non-routine task

300

When is the oxidizer required?

under vacuum and stripping resin batches, when unloading formaldehyde tanks 

400

What type of isolation is required for confined space entry? 

Blind/blank, physical disconnection and misaligned or air gap, or double block and bleed

400

Who can approve not wearing life line in a confined space? 

Site leader

400

What are 2 items that a fire watch is required to have during his/her duties?

20 lb fire extinguisher and a reliable method of measuring time, LEL meter,

400

How many labels should be on V80 waste drum?

3 - identify the contents, haz waste label, NFPA / DOT haz com

400

What does SWPPP stand for?

Storm water polution prevention plan

400

What is the tool used by HRP for documenting hazards

Spider diagram

400

When do you need to cancel a permit

when it expires or if conditions change 

400

Do we have any ozone depleting substances?

Yes - chiller, AC units

500

Where should the ESP be located during the job?  Where should it be after the job is complete?

With the lock box / attached to permit

500

what is the most common source of fatalities in confined spaces?

Air / atmosphere - low oxygen

500

How long does a fire watch need to stay after job is completed in a high hazard area

60 min

500

How long can Morganton store hazardous waste onsite before shipping it out?

180 days

500

What would result in a change in the storm water permit?

Any paving, grading, new containments changes to flow path

500

What are the 3 methods of mitigating energy

Eliminate, control and protect

500

Who is required to walk down jobs when issuing hot work permits

Both the issuer and receiver at the start and end of the job

500

When do we need to modify our air permit?

Changes within the plant (new chemcials, higher production rates, different process temperature etc) 

M
e
n
u