The LPU-34/P is inflated by pulling the beaded handles _________.
What is downward?
13-1-6.1-2 page 4-1 para 4-9.
100
The PRC-149 is operated when in a ________ position.
What is vertical?
16-30prc149-1 page 3-3 para 3-2.
100
It is recommended during the fitting of the CMU-33/A survival vest that these items not be attached to the vest.
What are the survival pockets and the life preserver?
13-1-6.7-4 page 3-9 NOTE at the top.
100
The long lengths of the CMU-27 flyer's coverall's are intended for wearer's with heights greater than this many inches.
What is 68 inches?
13-1-6.7-2 page 3-2 para 3-15.
100
The different types of chemical agents in chemical warfare are...
What are nerve, blood, blister, and choking?
Phase I page 11
200
After the LPU-34/P has been places in service, it should be inspected every this many days.
What is 360?
13-1-6.1-2 page 4-3 para 4-18.
200
The two different BIT modes on the PRC-149 are called...
What are the power-Up bit and Maintenance bit?
16-30PRC149-1 page 3-5 page 3-3.6
200
The SDU-39 distress marker light should be stowed in the survival pocket in this position.
What is dome facing down and ON/OFF switch facing inboard towards the wearer?
13-1-6.7-4 page 3-21 para s.
200
Replacement of the soles of the brown leather flyer's boots can be done if desired at an approx. cost of ______.
What is $50.00?
13-1-6.7-2 page 3-92 para 3-426
200
The battle of Midway occured on these dates.
What is June 3-5 of 1942?
Phase I page 35
300
The LPU-32/P survival items pouch includes these items...
What is a sea dye marker, a whistle, and a chem light with an attached lanyard?
13-1-6.1-2 page 20-1 para 20-8.
300
The PRQ-7 CSEL radio provides this many modes of operation for digital messaging transmission.
What is 5?
16-30PRQ7-1 page 1-2 para 1-1.2
300
When cleaning the CMU-33/A survival vest, it should be immersed in water and allowed to soak for this amount of time.
What is five minutes?
13-1-6.7-4 page 3-26 para 3-25 step 3.
300
The fabric of the fire-resistant flyer's glove will begin to char at this temperature.
What is 700 to 800 degrees?
13-1-6.7-2 page 3-111 para 3-594
300
On the propellor, these numbered blades are considered "blade targets".
What are two, four, six, and eight?
Phase II- page 7.
400
The ACC 711 technical directive states to do this to the casing of the LPU-32/P.
Place a tamper seal through the holes of the zipper pull tabs on the survival pouch.
NAT01 ACC 711 and statement of ACC 711 being incorporated in 13-1-6.1-2 page 20-6 para 20-27 step 4.
400
Maintenance on the PRQ-7 CSEL radio is limited to replacing only these items and performing this action.
What is replacing the battery, UHF/VHF antenna, strap and pouch, and using BIT to perform a self-test?
16-30PRQ7-a page 4-1 para 4.1
400
Tears in the mesh of the CMU-33/A survival vest exceeding this length may not be repaired.
What is 4 inches?
13-1-6.7-4 page 3-28 para 3-30.
400
When cleaning the CWU-23/P, each rinse cycle shall be a minimum of this long.
What is one minute?
13-1-6.7-2 CH 3 page 3-72 para 2.
400
The advisory lights panel consists of this many advisory lights.
What is 23 and one spare?
Phase II page 11
500
For the beaded handle pull test on the LPU-21E/P, all snap fasteners should release at or before this many pounds of pressure...
What is 25?
13-1-6.1-2 page 9-7 para 9-36 step 3.
500
BIT in regards to the PRQ-7 CSEL radio stands for _____.
What is Built-in-test?
16-30PRQ7-1 page 4-1 para 4.1.
500
The life preserver waist attachment straps on the CMU-33/A should be made out of this length of 1 inch nylon webbing.
What is 6 inches?
13-1-6.7-4 page 3-32 para 2.
500
IABDU stands for...
What is Improved Aircrew Battle Dress Uniform?
13-1-6.7-2 CH 3 page 3-30 figure 3-6.
500
A Class A mishap includes property damage of this amount and occupational illness results in this.
What is $2,000,000.00 or more and results in fatality or permanent disability?
Phase I page 9.