other
JBD Principles
JBD requirements
JBD General
More JBD
100

when should you cross a barrier?

only after area authority approval 

100

during a crane JBD what should be established?

safe step back areas

100

the potential for dynamic drops during a job require what? 

A JBD

100

what does JBD stand for?

Job By Design 

100

who do the JBD apply to?

Everyone

200

who do you call when trying to enter a red zone?

the Area Authority for that job 

200

what must be identified in every job?

Line of fire Hazards

potential for drops, moving equipment 

200

what crane op needs a JBD

all lifting operations 

200

What can we use to help plan a JBD?

Prompt card 

200

how can a JBD be improved 

After action reviews- improve JBD plan for next time 

300

who is allowed in a Black zone?

NO ONE

300

when is a JBD needed

when equipment in use or in motion during work with authorized and competent operators 

300

True or false working Tubulars needs a JBD 

True

300

When is it considered a formal JBD?

A formal JBD must be reviewed and approved by the rig manager

300

can anyone join the JBD mid work?

No, only people with assigned roles and responsibilities are permitted to be involved in execution of the work.

400

who has stop the job authority?

Everyone 

400

these zones must be established when planning JDB

what are Black or red zones 

400

coordination between the main and aux rotaries required what?

A JBD

400

Where can approved JBDs be found?

Available in the corporate JBD sharepoint website 
400

whos the Atlas rig manager?

Elton cherry 

500

what to do if work is deviating from JBD?

stop the job 

500

who does the JBD apply to 

all parties performing work 

500

does a complex job require a JBD?

Yes, Maintenance and repair work involving complex rigging and lifting of major component

500

What is a informal JBD

on site JBD plan developed during task planning and on site risk assessments using JBD principles 

500

What is the purpose of a JBD?

standardize the best way to safely and efficiently execute work and optimize the number of personnel required when working in proximity to operating / moving equipment.

M
e
n
u