Document listing all the jobs to be executed during the Turnaround.
What is the Scope of Work?
Visual document that organizes activities on a timeline
What is the Gantt chart?
Estimated expenses required before executing a turnaround
What is the TA Budget?
Exercise to evaluate the risk in every TA phase
What is TRM?
Documents that establish engineering or technical requirements for products, practices, methods or operations.
What is a Standard?
Review that eliminates non-esencial jobs to optimize time and cost.
What is Scope Challenge?
Key source calculated with Duration and manpower
What is man-hours?
What is a Capital Spare?
Document use to record all identified Risk, mitigation plan and contingency Plans
What is the Risk Register?
Is the document use by operations to marks the locations of the required Blinds, connections and disconnections..
What is a P&ID?
Name of the first tool used in the Scope Challenge
What is Scope Validation Tool?
Meeting perform to inform progress of TA to management and to address problems dificult to solve by the PMT
What is Steering Commitee?
Service with a cost more than 200,00 SAR
What is the Capital Service?
number of TRM perform including all TA phases?
Are they TRM-1, TRM-2, TRM-4 ?
Standarize specification that defines the technical requirements for piping componentes in a plant.
What is Piping Class?
Tool used to analize jobs using risk and cost
What is Scope Challenge?
Scheduling technique that identifies the longest path determining project duration.
What is the Critical Path?
Cyclic activities expenses in material and services are consider..
What is TA budget?
process of identifying, analyzing, assessing and monitoring the risks of turnaround and take appropriate measures to mitigate identified risks
What is TA risk Management (TRM)?
Is the sequence of activities that marks the longer duration in a TA.
What is a Critical Path?
It is done just after finalizing the Scope of work and no more activities suppose to be added without addional procedures..
What is the Final Job list?
It is the most common software use to schedule activities and control progress of TA
What is Primavera P6?
responsible to submit the TA Capex for M-CITT approval
Who is the PMT?
Is a Plan performed to minimize the Likelihood of ocurrance of a Risk
What is Mitigation Plan?
Document use to define the location of facilities, heavy and mobile equipment in the Plant, MOC signed by Operation and Management
What is the Area Reclasification document?