Collect Requirements
Define Scope
Work Breakdown Structure
Validate and Control Scope
JIC
100

What is a formal or informal approach to discover information from stakeholders by talking to them directly?

An interview

100

What is Product Analysis for?

projects that have a product as a deliverable as opposed to a service or result

100

Define decomposition 

Breaking down deliverables into smaller parts 

100

Name one component of verify scope.

Inspection or accepted deliverables 

100

How many units have we done?

5

200

Define Brainstorming

A technique used to generate and collect multiple ideas related to project and product requirements

200

What defines the process and criteria for accepting completed products, services, or results?

Product acceptance criteria

200

What is a WBS dictionary?

a dictionary that provides more detailed descriptions of the components in the WBS

200

What are Work Performance Measurements?

 Measurements that include planned vs. actual technical performance or other scope performance measurements

200

The more you take, the more you leave behind. What am I?

Footsteps

300

What is the delphi technique?

A group of experts answers questionnaires and provides feedback regarding the responses from each round of requirements gathering

300

What are Facilitated Workshops?

focused sessions that bring key cross-functional stakeholders together to define product requirements

300

Would a responsible organization be in a WBS dictionary?

YEs

300

What includes activities such as measuring, examining, and verifying to determine whether work and deliverables meet requirements and product acceptance criteria

inspection

300

A one story house has red walls, red furniture, and red floors what color are the stairs.

It's a ONE story house it has no stairs.

400

What are written sets of questions designed to quickly accumulate information from a wide number of respondents?

Questionnaires or surveys 

400

What is define scope?

the process of developing a description of the project and product

400

What is a component of the project management plan?

Scope Baseline 

400

What is the difference between control and verify scope?

Control scope monitors the project and product scope, Verify scope formalizes acceptance of the completed project deliverables

400


David's father has three sons: Snap, Crackle and ?

David

500

Name three of the group decision making techniques

  1. Unanimity 
  2. Majority 
  3. Plurality 
  4. Dictatorship
500

What is an example of project constraints?

budget, deadlines, life events, etc.

500

What is WBS?

The work to be executed by the project team to accomplish project objectives and create the required deliverables.

500

How many components does control scope have?

2, Variance analysis, Work performance analysis

500

What comes once in a minute, twice in a moment, but never in a thousand years?

The letter M

M
e
n
u