IPDE
Zone control
Smith system
signs
signals/road markings
100

These are the 4 steps of the IPDE process.

What are Identify, Predict, Decide, Execute.

100

The zones of the zone control system.

What is the front, right front, left front, rear, right rear and left rear.

100

Getting the big picture.

What is one of the keys to the smith system ?

100

The three categories of road signs.

What is Regulatory, Warning, and Guide?

100

These are lines you can not cross.

What are solid yellow or white lines?

200

The ever present possibility of an accident/conflict.

What is a driving risk?

200

A space that is not open to you because of a restriction.

What is a closed zone?

200

There are 5 of these in the Smith System.

What are the steps of the Smith system?

200

These are signs that have laws backing them up.

What are regulatory signs?

200

You may pass safely only when it is safe and you have these type lines.

What are yellow or white broken /dash lines?

300

you always finish the IPDE process every time you use it.

What is False?

300

The correct way to see your rear zones is by using your mirrors. T/F

What is True

300

The target zone.

What is as far as you can see ahead of you and right and left.

300

This is the only sign with the shape of a pentagon.

What is a school zone or school crossing sign?

300

You may not be inside this area when stopped at an intersection.

What are pedestrian walk ways?

400

The process of seeing, thinking, and responding.

What is the IPDE Process?

400

There are these number of zones in the Zone System of driving.

What is 6?

400

How to complete a proper search pattern .

What is searching far to near then right and left front, then rear, and to speedometer.

400

This is illegal at a Rail Road Crossing at any time.

What is circumvent or go around down barriers

400

These lines mean no parking.

What are diagonal white/yellow or blue lines?

500

These three major factors contribute to your degree of  risk while driving.

What are the vehicle, the driver, and the roadway?

500

These are the three structures of the Zone control System.

What is see a zone change, check other zones and create time and space by best speed control, lane position and communication.

500

The 5 steps of the Smith System.

What is Aim high, get the big picture, keep scanning, leave yourself an out and make sure they see you?

500

These signs are information signs.

What are guide signs?

500

You treat a signal light that is not working this way.

What is like a four way or all stop?

M
e
n
u