You and Me Both
Well, that's new!
If I had a nickel...
A Way With Words
100

Modern Look And Feel

Are there any plans to upgrade Function Point? My impression is that FP is looking dated with so many drop boxes and so much clicking. I think it's time for a fresher look and drag and drop.

UX: Personality

100

PERSONALIZE OUR PROFILE

HI THERE,

I AM NEW HERE...

AND I NOTICED SOME STUFF THAT COULD IMPROVE YOUR SYSTEM (VISUAL POINT ;)). 

I THINK WOULD BE GREAT IF  WE WOULD BE ABLE TO ADD MORE COLOURS  AND  GRAPHICS  AND PROFILE PICTURES. I SPOKE WITH JESS AND SHE MENTIONED THAT SOME PEOPLE ALREADY TALKED ABOUT IT. I HOPE YOU GUYS IMPLEMENT THAT SOON. IT WILL LOOK MUCH BETTER.

UX: Personality

100

Setting to Change the Systems Language

For agencies which operate with a different first language it would be helpful to have the whole system convert to French, for example. While there is the option to change module names and printout terminology, a setting to change the internal language of the system would create consistency for staff and clients, especially when it comes to reporting.  

UX: Language

100

Task section needs an all new design.

The task section of FP is pretty much unuseable in my opinion. This really needs to be reworked completely. Think Monday.com.

UX: Consistency
UX: Personality

200

Edit Time in Work Planning View 

I need to be able to edit time in pop up task window in Work Planning View. Currently, I have to open a new window to edit time and come bakc to it. Need to simplify this step.

UX: Information Architecture
UI: Input Controls

200

Notification sound

It would be great if I could get some sort of notification sound or banner when something comes through.

UX: Confirmation & Feedback

200

User friendly Mobile App

allow us to be productive and keep projects moving when we are traveling, in meetings, not at our desks.  

UX: Context


200

instead of basic user call it lite user

a lite user sounds more classy

UX: Language

300

Alerts Click Through to Kanban Task Card

It would be great to have the option of having the alerts click through to the kanban cards for those using that interface

UX: Information Architecture
UX: User Control

300

Change the Dot Color in Job Summary to indicate different estimate status.

The current job summary has the same color dark blue dot for "Estimate Status." If the dot were red it would prevent the inadvertent invoice from being generated.

UX: Confirmation & Feedback

UI: Informational Components

300

Visibility of Task Descriptions

It would be beneficial to have a short preview of a Task Descriptions on the cards within the Kanban view -  alerting staff that there is more information to view before proceeding with the task.  

Currently on the "Tasks - To Dos" list the descriptions is visible if you hover over the task.  Similar functionality would work well, if not an icon.

UX: Information Architecture

UI: Information Components

300

We would like the Work Planning View to be much easier to view what Company and project name is assigned. We would like it to show Company and Project name, not the type of work. Type of work is not at all helpful on this view and the hover is very time consuming.

UX: User Control

400

Change landing page when clicking on estimate

When clicking on the estimate, take me directly to the services section not the basic info section, saving an extra click.

UX: Information Architecture

400

Percent complete Button on the dashboard

I have to make a lot of clicks to use the percent complete button. It would be much easier if I could do this while tracking time at the dashboard.

UX: Information Architecture
UX: Context

400

Improve Notes UX

When I want to add a note to a new project, what seems logical is to click on 'Notes' in the menu. But if a note has not been added yet, I get an error pop-up that reads that the Notes menu is disabled. (can't include a screenshot here.)

I find this counter-intuitive as it tells you the function is disabled. So I hunt around looking for information on how to enable the Notes which doesn't exist. I only have to click on 'Add new Note' to enable this function.

Hoping you can add this UX improvement to your road map.

UX: Information Architecture

400

delete warning pop up in schedule 

a pop up warning in the schedule for when you are deleting tasks. We had over a 100 tasks deleted out of a schedule because someone was moving too fast, twice.

UX: Confirmation & Feedback

If we watched them work - this would also inform..
UX: Context
UX: Information Architecture

500

Alerts Click Through to Kanban Task Card

It would be great to have the option of having the alerts click through to the kanban cards for those using that interface

UX: Information Architecture
UX: User Control

500

Limiting the list of AEs within Client Portal Request

When clients are creating a request in the Client Portal, the default AE displays in the "Account Executive" field, but the user is still able to pick from the list of any other AEs in the system. It would be ideal to adjust that list per company so the user is not randomly/unintentionally selecting someone who does not have alerts set up to receive briefs.


UX: Complexity
UX: User Control

500

we would love to start using milestones on tasks, but you are unable to see them from the kanban board view which is our team's main view. We would like to add milestones like "PCA, internal review, or with client etc. " this would be super helpful to help keep tasks organized. Otherwise, we would like to customize the columns in the kanban board to have a "In reveiw" column. As of right now we are using completed as the "in review" and confirmed as completed as sort of a hack for this workflow.

UX: User Control


500

User Interface Contrast

The FP UI has no contrast for different controls. No colour on buttons. It's all just a wash of grey and beige, resulting in eye fatigue scanning the interface back and forth, over and over. The result is a extremely homogeneous look and feel.

UX: Accessibility


M
e
n
u