Flow path
Ventilation
give me the saw
size-up
Building construction
100

What is the term for the process of removing smoke, heat, and toxic gases from a building and replacing them with cooler, cleaner, and more oxygen-enriched air?

Ventilation

100

The interface exists at a vent, such as a doorway or window opening is the 

neutral plane 

100

If a roof must be cut to provide a ventilation opening what is the recommended minimum size of the opening?

4x4

100

What is the term for the weather- resistant surface of a roof

Roof covering 

100

Which type of structure, used in roof supports, is composed of relatively small and lightweight components in a series of triangles? 

A truss

200

Which undesirable effect can occur if windows on the upwind side are opened in a horizontal ventilation situation?

Fire may be forced into unevolved areas of the structure

200

What is the greatest danger to fire fighters performing vertical ventilation?

Roof collapse 

200

which type of ventilation openings can be used to stop fire spread in long narrow buildings, such as strip malls?

Trench

200

What are gusset plates?

Component-connecting plates made of wood or lightweight metal 

200

What is the construction feature called in which there are vertical channels in the exterior walls from foundation to attic, allowing rapid, unchecked vertical fire spread?

Balloon frame

300

what is it called if air is immediately drawn back into the building because of an incomplete sealed smoke ejector?

Recirculation 

300

where does the water come from in hydraulic ventilation?

A standard fire hose line 

300

A kerf cut is a 

A cut only as wide as the saw blade used for inspection

300

Freestanding walls that extend above the normal roofline are called 

parapet walls

300

Which roof type is generally found in commercial structures because it creates large open spans without requiring the use of columns?

Curved 

400

Which type of operation is needed to alleviate flashover condistions?

Transitional fire attack 

400

If the fire is in structural void spaces, positive- pressure ventilation should not be used until crews are in place and _____ is/ are available.

access to the space

400
What must a fire fighter be aware of when using a power saw to cut a ventilation opening in a roof

Structural supports

400

The factors to consider when determining when and where to ventilate include the size of the fire, the stage of combustion, the location of the fire in a building, and the:

available ventilation  options 

400

Modern wood- frame construction uses a technique that builds one floor at a time and inserts a plate between each floor that acts as a fire stop. What is this technique called?

Platform- frame

500

What is the phenomenon called in which smoke hangs low to the ground on a cool day with very little wind?

Smoke inversion

500

When setting a smoke ejector up in a window, in part of the window should it be placed, or does it matter?

in the upper part of the opening 

500

The factors to consider when determining when and where to ventilate include the size of the fire, the stage of combustion, the location of the fire in a building, and the 

available ventilation options

500

What is it called if air immediately drawn back into the building because of an incompletely sealed smoke ejection?

Recirculation 

500

What is caused by temperature differences inside and outside a building?

Stack effect

M
e
n
u