1.00 Structure of PM
2.00 Project Integration
3.00 Scope management
4.00 Time management
5.00 Cost Management
100

A temporary endeavor undertaken to create a unique product, service, or result. The temporary nature of indicates a definite beginning and end.

What is Project?

100

Defines each deliverable and further break down deliverables into smaller tasks

What is WBS?

100

The work to be executed by the project team to accomplish project objectives and create the required deliverables

What is Work Breakdown Structure?

100

A modification of a logical relationship that directs a delay in the successor activity

What is Lag?

100

A structured procurement technique that compares proposals from multiple suppliers to determine the best-value option based on cost, quality, and technical requirements

What is Vendor Bid Analysis?

200

Define the boundaries of the project and what is outside those boundaries.

What is Scope?

200

A formal approved document that defines how the project is executed, monitored, and controlled

What is Project Management Plan?

200

Elaborates the characteristics of the product, service, or result described in the project charter and requirements documentation

What is Project Scope Description?

200

Graphic display of schedule related information

What is Gantt Chart?

200

the connections, interactions, and causal links between past events, people, or data points, showing how one influences another over time.

What is Historical Relationships?
300

The knowledge, skills values, and attitudes of those working on the project.

What is Human Resources?

300

Intentionally adding extra features or functions to the products which were not included in the scope statement

What is Gold Plating?

300

Process of monitoring the status of the project and product scope and managing changes to the scope baseline

What is Control Scope?

300

A significant point or event in a project

What is Milestone?

300

define the total and periodic financial resources needed to execute a project, derived from the cost baseline and management reserves

What is Project Funding Requirements?

400

Responsible for developing a definition of the project; ensures that the project is delivered on time, to budget and to the required quality standard.

What is Project Manager?

400

Request to expand or reduce the project scope, modify policies, processes, plans or procedures, modify costs or budgets, or revise schedules

What is Change Request

400

Process of formalizing acceptance of the completed project deliverables

What is Validate Scope?

400

A schedule network analysis technique that modifies the project schedule to account for limited resources

What is Critical Chain Method?

400

The practice of examining historical data to identify consistent patterns, such as upward, downward, or horizontal movements.

What is Trend Analysis?

500

People or organizations who are actively involved in the project or whose interest may be positively or negatively affected by the performance or completion of the project.

What is Stakeholders?

500

Documented directions for executing the project work to bring expected future performance of the project work in line with the project management plan

What is Corrective Action?

500

Used to generate and collect multiple ideas related to project and product requirements

What is Brainstorming?

500

an output of a schedule module that presents linked activities with planned dates, durations, milestones, and resources

What is Project Schedule?

500

An approved, time-phased budget used to measure, monitor, and control project cost performance.

What is Cost Performance Baseline?

M
e
n
u