How much is the filing fee?
100
1 meter is equal to how many hectometers
o.o1 hm
The complaining party shall be referred to as?
Complainant/Protestant
Except when the appropriation is for family domestic purpose or when the quantity of water appropriated for agricultural use is not _____________, all appropriators shall pay to the Council in manner provided under Section 6.
more than 5 L/s
How much is the fee imposed in applying for a water permit?
Php 100
What period of time after inspection shall the report needs to be submitted?
10 days
Wells constructed in sand/gravel aquifer shall be provided with a water-tight casing to at least this depth below the lowest pumping level
1.5 meters
Where shall all income of the Council from fees and charges be remitted to?
National Treasury
What is the charge for a withdrawal rate less than 30 L/s?
P0.50 per L/s
Who will resolve disagreements arising from a project involving the use of water and whose decision is final?
Investigator
How many sections are there in Rule 1?
26
How long is the allotted duration of restoration of streams or rivers?
1 year
Whenever practicable, projects shall be conceived and viewed according to multi-purpose water resource planning concepts within _____________.
the area unit of a river basin
If the use of water extracted from natural source has a withdrawal rate of 2160 L/min, what is the charge?
P27.00
A permit to cultivate river beds, sand bars and tidal flats shall be __________ and shall not be construed as authorizing reclamation of the area...
non-transferable
What is the basis of water permits when using it for agriculture?
1 Liter per second per hectare of land
Who will receive the report and recommendation of the Public Works District Engineer concerning your application for a permit?
Public Works Regional Director
Give 3 contents of the complaints.
If the surface area for the use of water surface is 0.24 km2, what is the charge?
P570.00
In what year was the Water Code of the Philippines adopted?
1979
Who approves the plans and specifications for construction/repair?
Administrator of National Irrigation Administration and Minister of Public Works
Give at least five (5) requirements for Drilled Wells
Designed and constructed that it will seal off contamination ; No unsealed openings ; Durable materials ; In sand/gravel aquifer, casing atleast 1.5 meters ; In sandstone aquifer, casing atleast 1o meters ; In limestone, granite/quartzite aquifer, casing atleast 15 meters ; Properly plugged or sealed to prevent pollution of ground water ; Provided with control valves ; Drainage facilities
Should the parties fail to agree during the preliminary conference, what shall the investigator do?
The investigator shall immediately hear the case in the barrio, municipality or province where the subject of the controversy is located or at any other place agreed upon by both parties. Any disagreement as to venue shall be resolved by the Investigator whose decision is final.
If the use of water extracted from natural source has a withdrawal rate of 2760 L/min and the surface area for the use of surface water has a total area of 18.5 hectares, what is the total charge of water?
P454.50
What agency will grant the permit/authority for recharging groundwater supplies
National Pollution Control Commission