811
ISNet
Whiting SOP's
Contractor Responsibility
Sundry
100

The number to call before you dig

What is 811

100

The website to complete One Call Awareness training

100

The correct distance from underground facilities that must be maintained while excavating around buried facilities

What is 2' from the outside edge of the underground facility.

No mechanical excavation is allowed within 2’ of the outside edge of an underground facility

100

Required training before beginning any excavation around Whiting facilities

What is Whiting One Call Awareness training

100

Whiting Representative

What is:

A Whiting Representative is defined as, “a Whiting employee or a Whiting contractor who is Whiting’s eyes and ears on the project”.  It is the Whiting Representative’s responsibility to protect Whiting facilities, and ensure all Whiting excavation policies and recommended best practices are followed.

200

The life of a valid one call ticket

What is 21 days in ND, 30 days in MT

200

The required score for passing the One Call Awareness training on ISnet

What is 100%

200

The five foot rule

What is:

If the proposed area of excavation is within 5’ (critical area) of a Whiting underground facility, the facility must be spotted or identified (daylighted) by non-mechanical excavation (hydrovac ) prior to any mechanical excavation within 5’ of the underground facility (field meet is required)

200

Protect the markings

What is the contractors responsibility after the excavation area has been located and marked with paint and/or flags

200

Most misunderstood types of excavation

What is hydrovac, grading, digging with hand tools, just leveling out a site, staking down the port-a-john, installing a sign, pounding in a t-post

300

The website for submitting one call tickets

300

The item you receive from Whiting upon completion of online training in ISNet

What is an 811 hard hat decal

300

A field meet with Whiting Damage Prevention personnel

What is required before beginning any excavation activity that is within 20' of a buried Whiting facility

All Whiting Damage Prevention personnel are required to fully understand all aspects of an excavation project before they clear a one call ticket


300

Scope of work

What is the area a contractor will be excavating. 

Changes to scope of work may require a new one call ticket, but always requires communication with Whiting Damage Prevention personnel

300

Emergency one call ticket

What is a one call ticket used in case of sudden or immediate danger.  These tickets require immediate attention from operator/owners.

These tickets should never be used because someone forgot to submit a one call ticket

400

The most important information to provide when submitting a one call ticket

What is a valid address or location information

400

The penalty for damaging an underground facility and not reporting it the owner in North Dakota

What is a class A misdemeanor.

"An operator who knowingly damages an underground facility and who does not notify the operator as soon as reasonably possible or who backfills...is guilty of a class A misdemeanor"(NDCC Sec. 49-23-06.1.c)

400

The no mechanical excavation zone

What is the area 2' from the outside edge of the buried Whiting facility


400

Stop Work Authority

What is the right to stop any work or actions that are unsafe to personnel, equipment, or that if continued may damage the environment.  See complete document

400

Proper excavation procedures

What is never allowing excavation personnel to enter an open trench, always use proper "bell holes" that meet OSHA standards and guidelines if personnel are required to enter an excavation, and always provide proper egress access from excavation areas.

500

The five excavation activities that do not require a one call ticket in North Dakota

What is gardening less than 12", Farming less than 18", digging a grave in a cemetery, roadway grading, and railroad right-of-way

500

The color codes for buried utilities

What is red for electrical

Yellow for gas, oil, produced water

Blue for fresh water

Purple for produced water

Orange for communication lines

White for marking proposed dig area

500

The required response if a buried facility is struck or damaged

What is:

If damage results in the release of gas or liquid that endangers life, health or property, go to a safe location, notify 911 and the facility owner immediately.  Personnel are to take reasonable measures to protect themselves and those in immediate danger, the general public, property, and the environment until a full emergency response is organized.

500

Watford City Damage Prevention Exceptions

What is:

1. Routine Maintenance for Location Grading or Scraping

2. Documented Abandoned Underground Facility Standard

3. Backdragging for Base Beam Placement 

500

The most important component for preventing damage to underground facilities

What is communication between contractors and Whiting personnel