LEED Basics
Timeline & Process
Requirements
Strategies
Things Jennifer didn't tell us
100

What is the highest certification level in LEED?

Platinum

100

What is the 40/60 rule?

If 40% of the projects (by total floor area) fits a rating system, don't use it. If 60% fits, definitely use it. If it is between 40-60%, it is up to the project team to decide.

100

Times Square is classified as which Lighting Zone?

LZ4, the brightest

100

Green / vegetated roofs can contribute to earning which credit(s)?

SS Heat Island, SS Rainwater Management, WE Outdoor Water Use Reduction

100

USGBC headquarters is located where?

Washington, DC

200

What does LEED stand for?

Leadership in Energy and Environmental Design

200

When is the ideal time to bring the LEED consultant onto the project team?

Before site selection

200

Backlight, uplight and glare, or BUG ratings for luminaries, applies to which LEED credit?

SS Light Pollution Reduction

200

What is the website that can now be used for the SS Density credit to determine density based on services within walking distance?

200

According to Jennifer, what is the new frontier of sustainability in the built environment?

Social equity

300

How many points are required to earn LEED Gold?

60

300

At which design stage should the IPD / integrative process begin?

Schematic Design

300

Cubicle areas or open office areas are individual or shared workspaces?

Individual

300

What are some strategies to reduce heat island effect according to LEED?

Low albedo / white hardscape, green roofs, shaded areas, etc.

300

There are 3 ways that a project can earn Double Platinum certification. What are they?

  • NC then EB
  • CS then CI
  • EB then again EB
400

What is the name of the LEED application submission portal?

LEED Online

400

What are the 4 LEED application submission stages?

Design prelim and final; Construction prelim and final

400

In SS Open Space credit, LEED requires the 30% open space WHAT oriented and 25% of that must be vegetated?

Recreation oriented

400

Why should the project team engage the neighboring community?

To optimize social equity and potentially earn the Pilot credit for SE in the Community.

400

If we have a strategy that meets the intent of the LEED credit, but we aren't sure USGBC will accept it, what can we do?

Submit a CIR - Credit Interpretation Ruling

500

What is the intent of the Integrative Process credit?

To support high-performance, cost-effective project outcomes through an early analysis of the interrelationships among systems.

500

When you have a LEED question, what are your resources?

  • LEED rating system / Reference Guide 
  • LEED Credit Library
  • LEED User
  • LEED Coach
500

In the Rainfall Events calculator, when entering the historical data, you first remove values less than what?

2.5 mm

500

Why do smart building applications not count for LEED innovation points?

Innovation requires that the strategies be not already address in the LEED credits elsewhere and have a quantifiable, demonstrated environmental benefit.

500

What is a credit tradeoff and a credit synergy and give an example of one or the other.

Tradeoffs are when in the pursuit of one credit, another probably becomes less likely to be achieved. Ex: Increased ventilation reduces the Energy Optimization points. Synergies when achieving one credit helps another, such as capturing rainwater for toilet flushing and irrigation.