Take me on a Date
Back to the Features
I'm Relocated
A Number Game
Misc.
100
On this date, the newly renovated Recreation Center will finally open its doors.
What is January 5th, 2015?
100
This would be the biggest, and most obvious reason behind the SRC expansion.
What is expanded fitness space?
100
The SRC entrance will be relocating for the duration of the summer. During this time patrons will be using this entrance.
What is the current student/staff entrance?
100
The 50 million dollar budget for the expansion is funded by this group.
Who are the students?
100
Name the Contractor for the SRC Expansion Project.
Who is Howard S. Wright?
200
Today all lockers must be cleared of belongings.
What is June 5th, 2014?
200
This new feature will be very popular among Badminton and volleyball enthusiasts, among others.
What is the new 3-court gym?
200
Once the renovated facility opens, professional staff members will be relocating to offices within the Rec Center from this building.
What is Esslinger?
200
$25,000 has been used to study the feasibility of incorporating this feature.
What is a Video Wall?
200
Expect a lot of activity and delays on this street until mid July.
What is E. 15th street?
300
June 9th until September 14th, 2014 is the duration of this feature's relocation.
What is the SRC entrance?
300
Name these three aquatic features that will be a part of the expansion.
What are 12-lane lap pool, 3-lane recreational/leisure pool, and a whirlpool spa?
300
This feature of the Rec Center will be relocating and in its current place there will be a new Duck Store.
What is the Cardio Room?
300
This $38 dollars is paid by students in order to fund the SRC expansion project.
What is a facility fee?
300
This event will be held from July 22nd-July 27th, meaning contractors will be limited in their activities.
What is the Jr. World Track Meet?
400
(DAILY DOUBLE: must give date & three features) On this date three main features of the Rec Center will close, two of which will not reopen until the new facility is finished.
What is June 7th, 2014? What are the Rock Wall, Pool, Locker Rooms?
400
The renovated Rec Center will feature all-new studios for these areas.
What are cycling, boxing, mind-body, and personal training?
400
With locker rooms closing on June 7th, patrons will have these two alternatives for storing their possessions.
What are Gerlinger Locker Rooms and SRC Changing Rooms?
400
This amount has been set aside to upgrade existing areas such as the mat rooms and courts 4 & 5.
What is $100,000?
400
This feature of the New Rec Center is thick and strong enough to walk on, though it is not recommended.
What are skylights?
500
Mid-summer, these two features will close until September 14th. Name those features along with the closing date.
What are Fields 1 & 2? What is July 12th?
500
Upon the opening of the renovated rec center, the locker rooms will be upgraded with two new features. Name them.
What are a two story locker room, and private showers?
500
(DAILY DOUBLE): With the closing of the pool on June 7th, patrons will look elsewhere for their aquatic needs. Give two alternative options.
What are YMCA and Amazon Pool, etc?
500
This 10% of the project budget is set aside to use for things that are unforeseen or if anything needs to be changed.
What is Contingency?
500
There are several sustainability efforts being taken into consideration during the expansion project. Name one.
What are (1) Natural Ventilation (2) Use of old pool to collect roof water (3) electricity generated from exercise machines?
M
e
n
u