PPE
Procedures
General Safety
Final Jeopardy
100

The word that is identified by the second "P" in PPE.

What is "Protective"?

100

The first place to go with safety-related questions or concerns.

Who is your AMM?

100

Tool utilize to create your 20ft barrier  

What is danger tape?

100

List the steps of the PTP process in order

STEP 1 - Meet at the job location & Technician Verification

STEP 2 - Job Hazard Assessment & Safe Work Zone!

STEP 2.1 - Low Risk Tasks and Simple Risk Assessment

STEP 3 - Safe Methods/Controls, and Personal Protective Equipment (PPE)

STEP 4 - Complete your work

STEP 5 - Job Site Monitoring

STEP 6 - Post Job De-Brief 




200

An arc-rated, head-protective fabric that protects the neck and head except for a small portion of the facial area.

What is a Balaclava?

200

Required before performing a job/Repair

What is a PTP 

200
Can lead to injuries when workplace isn't kept clean and orderly, spills are left behind, hoses aren't wound up.
What is poor housekeeping?
300


This LOTO device is used for?

What is Circuit break Lockout

300

Place where the incident energy and PPE required to work on this cabinet is posted.

What is an Arc Flash label?

300

An incident that does not result in a serious injury.

What is a First Aid or Near Miss?

400

Every 6 months

How often arc flash gloves have to be send out for insulation testing?

400

The first time is used in the shift

How often does the PIT inspection checklist has to be filled?

400

10 MPH/KPH

What is the maximum speed allowed in the parking lot?

500

Cut rating required for RME gloves

What is cut level 3
500

contains steps like:

Contact the owner or ensure the person has left he building.

Gather AMM and Site safety approval

What is the LOTO removal form?

500

Is the number 1 RME safety violation in the network

What is LOTO violation?

M
e
n
u