The word that is identified by the second "P" in PPE.
What is "Protective"?
S.P.C.C.
What is Spill Prevention and Control Plan
Red
What is Color for all Emergency STOP devices.
PPE that is required in all areas of the plant floor.
What are Safety Glasses, Safety Shoes and Cut-Resistent Gloves While Cutting
Is responsible for preventing, reporting and clean-up of spills
Who is: All of Us!
1-5/8 Inch
What is the Maximum length of a Mill Kinfe Blade
PPE that is currently voluntary based on safety and industrial hygiene monitoring.
What is respiratory protection and hearing protection?
Where any collected material cleaned up is placed.
Where is Receiving Quarantine Area
The meeting point to gather in case of a fire or other evacuation emergency in the plant.
What is the front parking lot Assembly Point, or by the Green Light?
No OC Savannah employee is allowed up here.
Who is the roof/ceiling?
LOTO
What is Lockout/Tagout
Waste Water Collection Totes
Where is all collected water taken for recycling?
Designated In-Plant Severe Shelter Areas
What are 1st Floor Men/Women Restrooms and Locker Rooms
Ask the Trapped Employee
What is First Step in Mill Rescue to accessing the situation.
Spill Prevention and Containment for Tank Farm
What are the Spill Kit and Drain Covers in the Outside Trailer
Primary & Secondary Routes of Exit
DAILY DOUBLE!! Emergency Egress Map
Make the Call
What is call the Lab to Request 911 emergency response.